5
LRT
Eglinton Crosstown LRT
$12.6 BILLION
2023 Rank: 5
Location: Toronto, Ont.
Owner: Metrolinx
Procurement Agent: Infrastructure Ontario
DBFM Team: Crosslinx Transit Solutions—ACS Infrastructure Canada, Aecon,
EllisDon, AtkinsRéalis, and Dragados Canada
Contractor: Design-Build JV: Aecon Infrastructure Management, Dragados
Canada, EllisDon, and AtkinsRéalis Constructors (Pacific)
Engineer: Jacobs and 4 Transit—WSP (project management/engineering/
GIS); Hatch, and Parsons (consulting engineer, technical advisor, construction
oversight); AECOM (consulting engineer, preliminary planning/study, design);
Wood E&I (WSP) (consulting/environmental/geotechnical studies); LEA
(design); Parsons
Architect: Station Architects; NORR Architects & Engineers; DIALOG; Daoust
Lestage
Other Key Players: AECOM (consulting engineer, preliminary planning/study,
design); Aon (risk advisor); Arup (preliminary design work); Arcadis-IBI Group
(design engineer); BTY Group (independent certifier); Caterpillar; Entro;
Entuitive (structural eng. consultant); EY (advising gov’t.); EXP (instrumentation
and monitoring); Golder-a WSP company (geotechnical services); Hanscomb
(preliminary and concept designers’ cost consultant for 7 stations);
Infrastructure Ontario; INTECH (insurance advisor); McCormick Rankin; Munro
(concrete); Norton Rose Fulbright; Obayashi Canada; Kenny Construction; EXP;
Kenaidan Contracting; Technicore (contractors); URS/Parsons JV (systems
design); CRH Canada (cement supply); Dufferin Construction (prep work);
McMillen Jacobs Associates (independent verifier); Mott MacDonald (track
design review and tunnel construction management); Englobe (geotechnical
studies); CIMA+ (traffic mgmt. and road safety audits); Morrison Hershfield
(transit operations and maintenance advisory services); GHD (traffic mgmt.,
site civil support); AGAT Labs; Comtech (consulting services); Deloitte; Geosolv;
HKA; GFL (excavation, shoring, soil management); R.V. Anderson Associates
Ltd.; Turner & Townsend (cost management); E.S. Fox
Supplier: Bombardier (vehicle); DECAST Ltd. (precast tunnel liner segments);
CRH Canada (cement); Canam Group (steel fabricator); Victaulic
Financiers/Banks: National Bank Financial and Scotiabank Global Banking
and Markets (underwriters); Alberta Treasury Branches; Caisse Centrale
Desjardins; Bank of Nova Scotia; Bank of Tokyo-Mitsubishi UFJ; and TorontoDominion Bank (mandate lead arrangers); BMO Capital Markets (financial
advisor)
Architects: (Station Architects) NORR Architects & Engineers; DIALOG; Daoust
Lestage
Management Consultants: Infrastructure Ontario; Metrolinx; SEG
Management Consultants (fairness advisor); EY (transaction advisor); BMO
Capital Markets (financial advisor); Aon Risk Solutions (insurance advisor)
Legal: Blake, Cassels & Graydon (Metrolinx legal advisor); Fasken Martineau
DuMoulin (advising lenders to consortium); Borden Ladner Gervais (legal
advisor); DLA Piper (Canada); Norton Rose Fulbright; Stikeman Elliott LLP
Funding: P3
Substantial Completion: 2024
18
RENEW CANADA – TOP100 2024
METROLINX
This light-rail transit line will run along Toronto’s Eglinton Avenue
between Mount Dennis (Weston Road) and Kennedy Station. Part
of the Government of Ontario’s light-rail transit plan for the city,
this 19-kilometre corridor will include an 11-kilometre underground
portion between Keele Street and Laird Drive. When running at
street level, the line will carry passengers in dedicated right-of-way
transit lanes separate from regular traffic with priority signaling at
intersections. Travelling at an average speed of 28 km/h, it will link
to 54 bus routes, three subway stations, and various GO Transit lines.
The capacity of the LRT vehicles is 15,000 passengers per hour per
direction, with the flexibility to easily remove or add cars.