TOP100 2026 Report - Report - Page 28
10
SUBWAY
Montreal Metro
Blue Line Extension
$7.6 BILLION
2025 Rank: 10
Location: Montreal, Que.
Owner: Société de transport de Montréal (STM)
Project Manager: Blue Line Project Office (Société
de transport de Montréal)
Project Partners: Autorité régionale de transport
métropolitain (ARTM), ministère des Transports de
la Mobilité durable du Québec (MTMD), Société
québécoise des infrastructures (SQI) and City of
Montréal
TBM Contract: Mobility bleu Horizon S.E.N.C.
(Pomerleau, EBC and Spie batignolles)
Engineer: AECOM; EXP; Tetra Tech; Stantec;
AtkinsRéalis
Architects: ACDF architecture inc., Bisson Fortin,
COEX, Jodoin, Lamarre, Pratte, Lemay Co inc.,
Les architectes FABG inc., St-Gelais Montminy et
associés
Other Key Players: WSP (blasting and vibration
consulting); EY (business case advisor); Englobe;
Brodeur Frenette (risk management expert advisor);
CIMA+; Wood (WSP) (geotechnical studies); Egis;
Groupe ABS (quality control/geotechnical studies/
environmental assessment); Ombrages (lighting
consultant); AGAT Labs (quality assessment); Marsh
Canada (risk advisor)
Legal: Lavery
Funding: Public
Substantial Completion: 2031
28 RENEW CANADA – TOP100 2026
STM
The Blue Line Extension project will add approximately six kilometres of track and five new stations
to the current 12-station Blue Line, one of four Metro
lines that runs through the Greater Montreal Area. The
extension will run along Jean-Talon Street, ending east
of Highway 25. The tunnel boring machine (TBM) arrived in October 2025. Custom-built in Germany for the
Montreal Metro, the drilling machine, with a diameter
of 9.7 meters, will be used to excavate and concrete
4.6 kilometers of tunnel to Anjou. The TBM’s assembly
will take place over several months, with commissioning scheduled for spring 2026.