TOP100 2024 Report - Report - Page 34
The Scarborough Subway Extension is a 7.8-km extension of TTC’s Line 2
Bloor-Danforth Subway, from the existing Kennedy Station northeast to McCowan
Road/Sheppard Avenue. The line will include three new stations at Lawrence Avenue
and McCowan Road, Scarborough Centre and a terminal station at McCowan Road
and Sheppard Avenue. Construction for the Scarborough Subway Extension began
in the spring of 2021 at the corner of Sheppard Avenue and McCowan Road with
the excavation of the tunnel launch shaft, which is about 80 metres long, 28 metres
wide, and 28 metres deep. Tunnelling started in January 2023.
15
PUBLIC SPACES
Centre Block
Rehabilitation Project
$5 BILLION
The Government of Canada is undertaking a comprehensive rehabilitation
of the Parliament buildings in Ottawa, including the rehabilitation of the Centre
Block and the construction of Canada’s new Parliament Welcome Centre. These
represent the largest and most complex heritage rehabilitation projects in
Canadian history. The project remains on track to complete main construction in
34
2023 Rank: 14
Location: Scarborough, Ont.
Owner: Metrolinx
DBF Team (Advance Tunnel contract): Strabag Scarborough Project Inc.
• Construction Team: Strabag Inc.
• Design Team: ARUP Canada Inc., Brian Isherwood & Associates Ltd.
• Financial Advisor: Strabag Inc.
Stations, Rails & Systems contract: Scarborough Transit Connect
Applicant Leads: Aecon Infrastructure Management Inc., FCC Construction S.A.
Design Prime Team Member: Mott MacDonald Canada Ltd.
Construction Prime Team Members: Aecon Infrastructure Management Inc., FCC
Construction S.A.
Engineer: OneT+ (Gannett Fleming, Arcadis-IBI Group, GHD)
Design: Hatch (tunnel design); WSP (systems design and management); AECOM
(station design)
Environmental Services: Englobe
Other Key Players: Jacobs (quality mgmt. and risk assessment); Comtech; WSP
(operator’s representative); Morrison Hershfield (consulting engineer); Wood
E&I (WSP) (consulting engineer/geotechnical studies); CIMA+; Dillon Consulting
(technical advisory services); Entuitive; EY (management consultant); GFL
(excavation, shoring, soil management); Hanscomb (cost consultant); Parsons
(consulting engineer); R.V. Anderson Associates Ltd.; Turner & Townsend (project
controls/estimating); Matrix Solutions Inc. (environmental specialists); AGAT Labs
Legal: Borden Ladner Gervais (for the owner); Norton Rose Fulbright (for Strabag
Scarborough Project Inc.)
Funding: P3
Substantial Completion: 2026
METROLINX
Scarborough
Subway Extension
$5.5 BILLION
RENEW CANADA – TOP100 2024
2023 Rank: 15
Location: Ottawa, Ont.
Owner: Government of Canada
Project/Construction Manager: PCL/EllisDon JV
Architect: CENTRUS a Joint Venture of WSP and HOK
Other Key Players: Turner & Townsend (risk management services); Colliers
Project Leaders Inc. and Tiree Facility Solutions (project management support
services for Centre Block); Atwell-Morin (northern ventilation towers rehabilitation
for Centre Block); Golder-a WSP company (geotechnical studies/environmental
engineering); Morrison Hershfield (code consulting); Engineering Harmonics;
EY (business case advisor); Aon (risk advisor); Kasian, Moriyama & Teshima
Architects (West Memorial Building architectural and interior design); Hanscomb
(cost consultant); Arcadis-IBI Group; Englobe; EXP; Entuitive (construction
engineering services); E.S. Fox; GeoVerra; NORR Architects & Engineers
Funding: Public
Substantial Completion: 2030-31
the 2030-31 timeframe and within the estimated
$4.5-5 billion budget. The project has completed
the schematic design phase and is well into design
development. On the construction site, current
progress includes the completion of the main
excavation for the new Parliament Welcome Centre
and the drilling of the wells needed to install a geo-exchange system. In
addition, the interior demolition and removal of hazardous materials within
the Centre Block is substantially complete, the restoration of over 20,000
heritage assets has commenced and the conservation of the exterior
masonry has also progressed.
TOP100PROJECTS.CA
GOVERNMENT OF CANADA
14
SUBWAY