TOP100 2026 Report - Report - Page 34
Iona Island Wastewater
Treatment Plant Projects
$6 BILLION
2025 Rank: 8
Location: Richmond, B.C.
Owner: Metro Vancouver
Engineer: AECOM, Jacobs; Mott MacDonald
(consulting)
Other Key Players: Musqueam Indian Band; WSP
(geotechnical services/permitting); McElhanney
(site surveyor); EY (management consultant);
Graham (contractor); INTECH, Marsh Canada (risk
advisor)
Program Management Consultants: Stantec;
Colliers Project Leaders
Architects: Space2Place, Local Practice
Legal: Bennet Jones LLP
Funding: Public
Substantial Completion: 2035
15
LRT
Surrey Langley SkyTrain
$6 BILLION
The first rapid-transit project south of the Fraser in 30 years, the Surrey Langley
SkyTrain will allow travel between Langley City Centre and King George SkyTrain station in
approximately 22 minutes, and in just 65 minutes between Langley City Centre and Waterfront station in downtown Vancouver. The project is expected to serve a daily weekday
34
METRO VANCOUVER
In Oct. 2025, Metro Vancouver’s Board of Directors
voted to take a new approach to upgrading the Iona
Island Wastewater Treatment Plant. Rather than
building an entirely new facility, Metro Vancouver will
rehabilitate the existing primary treatment plant and
deliver phased upgrades to achieve compliance for
secondary wastewater treatment. This approach is possible in part thanks to more space-efficient wastewater
treatment technology. The Iona Island Wastewater
Treatment Plant Projects plan has been updated to
encompass a smaller scope of work, with a new cost
estimate of $6 billion, compared to the previous
$9.9-billion plan approved by the Board in 2022.
RENEW CANADA – TOP100 2026
2025 Rank: 13
Location: Surrey/Langley, B.C.
Owner: Province of British Columbia (The Transportation Investment
Corporation is leading the delivery of the project on behalf of the Ministry of
Transportation and Infrastructure). SkyLink Guideway Partners (DBF for the
elevated guideway and associated roadworks, utilities and active transportation
elements): FlatironDragados; Ledcor Investments Inc.; Ledcor Mining Ltd. South
Fraser Station Partners (build 8 new stations): Aecon Constructors; Acciona
Infrastructure Canada Inc.; Pomerleau BC Inc. Transit Integrators BC (design and
build the systems and trackwork): AtkinsRéalis Major Projects Inc.; AtkinsRéalis
Canada Inc.; Western Pacific Enterprises Ltd.
Engineer: Hatch (lead engineer); Westco, DIALOG; AECOM (design); COWI
(owner’s); McElhanney (design); EXP (engineering design); Entuitive
Other Key Players: Deloitte; Golder (WSP) (geotechnical studies); Ausenco;
Charter PDI; Hanscomb (cost consultant); Stantec (early works); Parsons;
Colliers Project Leaders; EY (advisory services); GeoVerra (early works); Egis;
INTECH, Marsh Canada (risk advisor); Turner & Townsend (cost consultant); Bird
Construction (Fraser River Pile & Dredge -subsidiary)
Legal: Norton Rose Fulbright
Funding: Public
Substantial Completion: 2029
ridership of 56,000 in the opening year, increasing to 80,000 by 2050. Construction
in 2025 was focused on foundations for roughly 200 guideway piers and columns.
The pre-cast concrete facility in Surrey’s Campbell Heights was completed, and construction of Green Timbers and Langley City Centre stations was started in 2025.