RC108 SeptOct2023 - Magazine - Page 37
PREFAB PRECAST CONCRETE BUILDS ON...
ACCELERATED BRIDGE
CONSTRUCTION
VAUDREUIL-SOULANGES
HOSPITAL
PROJECT (ABC)
CISSS
2023 Top100 Projects Rank: 29 Value: $2.6 billion
SNC-LAVALIN announced it will be undertaking
design and engineering services work as
part of the construction of the new Vaudreuil-Soulanges Hospital.
The work will be performed as part of a
multidisciplinary team assembled by Pomerleau, on behalf of the Société québécoise
des infrastructures (Quebec Infrastructure
Corporation).
“Engineering a better built environment is
at the heart of what we do for communities
all around the world,” said Ian L. Edwards,
president and CEO, SNC-Lavalin. “Few
pieces of social infrastructure have greater
value to the people they serve than hospitals.
Governments recognize in the aftermath of
the COVID-19 pandemic how important it
is to have high-quality patient care available
that is supported by world-class facilities like
the Vaudreuil-Soulanges Hospital.”
As part of a six-year contract, SNC-La-
valin’s Engineering Services group
across Quebec and its project partner Pageau
Morel inc., will provide design and engineering services for the mechanical and electrical
engineering of the hospital. Decarbonization
and digital delivery capabilities will be at the
heart of service delivery. This includes using
Building Information Modelling (BIM) to create a 3D digital representation of the building
and supporting efforts to achieve LEED building environmental certifications via efficient
use of energy, materials, and water.
Located in Vaudreuil-Dorion outside
of Montreal, the project is scheduled to open
in 2026, providing the area with 404 beds, 11
operating rooms, and an emergency room
with a capacity for 41 patients.
For additional details on this year’s Top100
Projects report. visit top100projects.ca
• Faster Speed of Construction
• Reduced Traffic Disruptions for the Public
• Unlimited Aesthetics
• Lowest Total Cost of Ownership (TCO)
• Plant Manufactured with Significant
•
Improved Quality and Durability
Greatly Reduced On-Site Formwork and
Associated Safety Issues
Samuel de Champlain Bridge, Montréal, QC
Owner: Infrastructure Canada | Architect: Arup Canada - Collaboration with Dissing+Weitling and Provencher Roy | Engineer: Stantec and Ramboll
Photo: BPDL, Alma, QC
PREFABRICATED AND MODULAR BRIDGE CONSTRUCTION
CELEBRATING BROWNFIELD CHAMPIONS
Prefab Precast Concrete Accelerated Bridge Construction (ABC) uses innovative planning,
design, resources, technologies and precast concrete prefabrication techniques to
accelerate bridge construction without compromising Quality, Durability and Safety.
November 24, 2023
A Québec-based Precast Concrete Company supplied 315 pier leg segments; 44 pylon
segments; 9,636 deck slabs; 32 box girders; 142 girders; 6,170 square metres
(66,415 square feet) of architectural panels; 495 panels for the electrical rooms;
and other precast concrete elements including retaining walls, pipes and more.
For more information on this project: http://www.cpci.ca/en/about_us/project_month/january_2020/
The Delta, Toronto
Submit your Nominations by September 18
BRIDGE PUBLICATIONS
CPCI and PCI offer free resources on the design and construction of bridges, including the PCI
Bridge Geometry Manual: https://www.pci.org/bookstore and other CPCI Bridge Publications:
https://www.cpci.ca/en/resources/technical_publications/
powered by
E: info@cpci.ca
TF: 877.937.2724
RENEWCANADA.NET
For more information on the Canadian Precast Concrete
Quality Assurance (CPCQA) Certification Program, please
brownieawards.ca
visit: www.precastcertification.ca
SEPTEMBER/OCTOBER 2023 – RENEW CANADA 37