TOP100 2026 Report - Report - Page 50
Roberts Bank
Terminal 2
$3 BILLION
2025 Rank: 27
Location: Vancouver, B.C.
Owner: Vancouver Fraser Port Authority
Engineer: Moffatt & Nichol (owner’s engineer); Stantec (engineering and design); AECOM
(engineer-environmental); Parsons (engineer-planning); WSP (marine/highway/bridges/
buildings, geotechnical, construction management, quality assurance—reporting to PM,
construction contract administration, geomatic scanning)
Environmental Services: Ecofish; Ecowest; Ausenco; Golder (WSP) (environmental &
geotechnical services); Ventus, BlueDot
Other Key Players: KPMG (procurement advisory); Hamburg Port Consultants (terminal
operations); McElhanney (site surveyor); Collings Johnston Inc. (program management);
Hatch (project controls)
Legal: Cassels & Graydon LLP, Fasken Martineau DuMoulin LLP (legal advisor)
Substantial Completion: 2030+
Roberts Bank Terminal 2 involves the construction of a trade-enabling three-berth
marine container terminal on new federally owned land, built in subtidal waters to
minimize environmental effects. The project includes construction of new land and a
wharf that will accommodate a new marine container terminal; a widened causeway
to accommodate additional road and rail infrastructure and link existing networks
to the marine terminal; and an expanded tug basin for additional tugs. The VFPA
announced in Nov. 2025 the shortlist of three qualified construction teams as part
of its procurement process for the landmass and wharf component of the project.
NEW
31
WATER/WASTEWATER
North End Sewage
Treatment Upgrades
$3 BILLION
The scope of work for the first capital project includes the design and
construction of a new headworks facility that will include a raw sewage
pump station, a micro-tunnel extension of existing interceptor sewers, a
grit removal system, a main control room, fine screens and compactors,
and a plant emergency generator facility. The second capital project
includes the design and construction of a new biosolids facility that will
address end-of-life equipment and regulatory requirements regarding
the recovery of nutrients and maximizing biosolids reuse. It will add new
facilities to treat the sludge from the City’s three sewage treatment plants
and replace end-of-life equipment. The third capital project includes the
design and construction of the nutrient removal facilities that will remove
nitrogen and phosphorus from the wastewater.
32
2025 Rank: 37
Location: Winnipeg, Man.
Owner: City of Winnipeg
Engineer: KGS Group (owner’s advocate/consultant)—NEWPCC Power Supply; AECOM
(consulting engineer)—NEWPCC Upgrade: Headworks, Biosolids & Nutrient Removal Facilities,
Design Builder—NEWPCC Power Supply: Black & Macdonald, AECOM (design engineer), Design
Builder—NEWPCC Headwork Facilities: Red River Solutions (Aecon/Oscar Renda JV); Hatch
(design engineer)—NEWPCC Biosolids Facilities Upgrade: Red River Biosolids Partners General
Partnership (Aecon, Oscar Renda Contracting of Canada Inc., MWH Constructors Canada Ltd.
Other Key Players: EY (management consultant); Veolia; P1 Consulting Ltd.; KGS Group Ltd.
(owner’s advocate/consultant); Wood (WSP) (design engineer/geotechnical studies); Stantec
(engineer-design); Colliers Project Leaders; Hanscomb (cost consultant); Hatch; Deloitte LLP;
Buy Social Canada; Victaulic (supplier)
Legal: Blake, Cassels & Graydon
Funding:
Federal: $483 million
Provincial: $264 million
Municipal: $2.253 billion
Substantial Completion: 2032
HEALTHCARE
Surrey Hospital and
B.C. Cancer Centre
$2.88 BILLION
The new state-of-the-art hospital will provide increased capacity in areas such as emergency,
surgical, inpatient, ambulatory care, medical imaging, laboratory, pharmacy, and cancer care services,
to support thousands of additional patients every year. The new hospital and cancer centre will feature
168 acuity-adaptable inpatient beds, a surgical/perioperative suite with five operating rooms, four
procedure rooms, and an emergency department with 55 treatment spaces. Since breaking ground
in 2023, the project has steadily progressed through critical phases including geotechnical testing,
shoring, and excavation, with construction having reached Level 2 with concrete pillars and formwork.
The north ramp is almost complete, and work has started on the south ramp.
50
RENEW CANADA – TOP100 2026
2025 Rank: 28
Location: Surrey, B.C.
Owner: Fraser Health Authority
DB Team: EllisDon Design Build Inc.
Other Key Players: Arcadis (owner’s technical advisor);
WSP (preliminary design); Stantec (consulting engineer);
Hatch (environmental engineer); Victaulic (supplier); Cartel
Communications, Inc.; EXP (owner’s geotechnical engineer);
EY (management consultant); Limited Consulting Engineers
(engineer-design); INTECH, Marsh Canada (risk advisor);
Entuitive (engineer)
Architects: Parkin Architects Ltd.; ZGF Architects Inc.
Legal: Bennett Jones LLP
Funding: Public
Substantial Completion: 2029