TOP100 2024 Report - Report - Page 52
32
HEALTHCARE
Projet Hôpital
Vaudreuil-Soulanges
$2.6 BILLION
This ambitious infrastructure project will provide the region with a 404-bed
hospital, featuring an 11-room operating block and a 41-stretcher emergency
department—one of the biggest in the Montérégie region. This project will position the
Hôpital de Vaudreuil-Soulanges as a leading-edge facility and a model for the next
generation of Québec hospitals. The hospital will be equipped with state-of-the-art
technologies and innovations aimed at optimizing the experience for both patients
and staff. It will also be built according to environmental and sustainable development best practices.
33
HIGHWAY
Louis-HippolyteLafontaine Tunnel Project
$2.5 BILLION
The original Louis-Hippolyte La Fontaine Tunnel was constructed in 1967 and
needed significant rehabilitation. In July 2020, the contract was awarded for the
rehabilitation project. Construction work began in 202$1. The main work in the
tunnel consists of carrying out major structural repairs, modernizing operating
equipment, redeveloping service corridors, and adding fire protection. In 2023,
the repair of the pavement of autoroute 25 southbound was carried out between
the tunnel and rue Sherbrooke, in addition to structural repairs on the Souligny
interchange. The repair of the pavement of autoroute 25 northbound began in
2023 and will continue in 2024. Concreting of walls and arches are underway in
the tunnel’s southbound tube, as is the work to modernize operation systems.
34
2023 Rank: 29
Location: Vaudreuil-Dorion, Que.
Owner: CISSS (Centre intégré de santé et des services sociaux)
de la Montérégie-Ouest
Engineer: CIMA+; BPA (constultant); EXP (design/environmental/geotechnical
studies)
Architect: Provencher et Roy; Yelle Maillé et associés architectures inc.
Other Key Players: Pomerleau (contractor); Pageau Morel & Associés Inc. (contractor’s
engineer); Stantec Consulting Ltd.; AtkinsRéalis (mechanical & electrical design); SDK
et associés; WSP Canada; Jodoin, Lamarre, Pratte architects Inc. (contractor’s architects); Lemay Co. Inc.; Menkes, Shooner, Dagenais, Letourneu Architects; EXP
Funding: Public
Substantial Completion: 2026
2023 Rank: 49
Location: Montréal, Que.
Owner: Ministère des Transports et de la Mobilité durable (MTMD)
P3/Project Team: Vinci (subsidiaries Eurovia and Dodin Campenon Bernard);
Pomerleau (50-50 JV)
Engineer: Parsons, Tetra Tech (owner’s engineer); WSP-Hatch JV (design);
Lombardi (tunnel safety); EXP (design, consulting)
Other Key Players: Aon (risk advisor); CIMA+, Egis (independent certifier); Jacobs
(mgmt. consultant); Deloitte (mgmt. consultant); Englobe; GHD (materials tester)
Financier: Desjardins Capital Markets
Legal: Borden Ladner Gervais; Stikeman Elliott LLP
Funding: P3
• Federal: $427.7 million
• Provincial: $2.064 billion
• Municipal: $4.7 million
Substantial Completion: 2026
HEALTHCARE
New Hospital for Sick Children
$2.4 BILLION
Dubbed ‘Project Horizon’ by SickKids, the three-phase project to rebuild
and rehabilitate The Hospital for Sick
Children in Toronto is well underway.
There are three phases to the project,
which are expected to take a total of
15 years to complete: A new 22-storey
Patient Support Centre; The Peter Gilgan
Family Patient Care Tower; and Renovations to the existing campus.
The new Patient Support Centre, was
officially opened in September, 2023.
The Patient Care Tower is scheduled for
completion in 2029, followed by the
completion of the Peter Gilgan Family
Patient Care Tower in 2035.
52 RENEW CANADA – TOP100 2024
2023 Rank: 30
Location: Toronto, Ont.
Owner: Hospital for Sick Children
Engineer: WSP (planning)
Patient Support Care Project Team - Construction Manager: PCL Constructors
Canada Inc.; Structural Consultant: Entuitive; Electrical Consultant: Mulvey &
Banani; Mechanical Consultant: The Mitchell Partnership; Demolition: Priestly
Demolition, Peter Gilgan Family Patient Care Tower-Stage 2 Functional Program
Design Team: Stantec/KPMG joint venture; Functional Programmer: RPG
Engineer: WSP (stage 1&2 master planning)
Other Key Players: Hanscomb (cost consultant); EY, HKA (management
consultant); EY
Supplier: Stantec
Legal: Borden Ladner Gervais, McMillan LLP (for the owner)
Funding: Public
Substantial Completion: 2035
TOP100PROJECTS.CA