35
HEALTHCARE
Burnaby Hospital Redevelopment
$2.4 BILLION
The Burnaby Hospital redevelopment is a multi-phase project that will transform the hospital into a modernized medical
and surgical health care campus. It will see two new patient
care towers, new cancer centre, and expansion and renovations
to existing buildings on campus. The first phase will include the
construction of the new Keith and Betty Beedie Pavilion and
the expansion and renovations to the existing Support Facilities
Building. Construction is currently underway, and the new
buildings are expected to open in 2025. The second phase will
increase the hospital’s bed capacity a nd expand cancer services. Procurement is underway for phase two and the projected
timeline for completion is in 2030.
36
technical advisor); Morrison
Hershfield (consulting engineer);
Mulvey & Banani; Victaulic
(supplier); Kontur (geotechnical
services)
Legal: McMillan LLP
Funding: Public
Substantial Completion: 2030
WATER/WASTEWATER
North End Sewage
Treatment Upgrades
$2.34 BILLION
The scope of work for the
first capital project includes
the design and construction
of a new headworks facility
that will include a raw sewage
pump station, a micro-tunnel
extension of existing interceptor
sewers, a grit removal system, a
main control room, fine screens
and compactors, and a plant
emergency generator facility. This
project is currently in construction. The second capital project
includes the design and construction of a new biosolids facilities that will address
end-of-life equipment and regulatory requirements regarding the recovery of nutrients and maximizing biosolids reuse. It will add new facilities to treat the sludge
from the City’s three sewage treatment plants and replace end-of-life equipment.
37
2023 Rank: 51
Location: Burnaby, B.C.
Owner: Fraser Health Authority
Procurement Manager:
Infrastructure BC
DBF Team: EllisDon Infrastructure
(Phase 1)
Other Key Players: WSP (owner’s
2023 Rank: 40
Location: Winnipeg, Man.
Owner: City of Winnipeg
Engineer: KGS Group (owner’s advocate/consultant)—NEWPCC Power Supply;
AECOM (owner’s advocate/consultant)—NEWPCC Upgrade: Headworks, Biosolids
& Nutrient Removal Facilities, Design Builder—NEWPCC Power Supply: Black
& Macdonald, AECOM (design engineer), Design Builder—NEWPCC Headwork
Facilities: Red River Solutions (Aecon/Oscar Renda JV); Hatch (design engineer)
Other Key Players: EY (management consultant); Veolia; P1 Consulting Ltd.; KGS
Group Ltd. (owner’s advocate/consultant); Wood E&I (WSP) (design engineer/
geotechnical studies); Colliers Project Leaders; Hanscomb (cost consultant);
Deloitte LLP; Buy Social Canada; Victaulic (supplier)
Legal: Blake, Cassels & Graydon
Funding: Public
• Federal $317 million
• Provincial $264 million
• Municipal $1.755 billion
Substantial Completion: (Headworks) 2027; (Biosolids & Nutrient Removal) 2030
This project is currently in the procurement phase. The third capital project
includes the design and construction of the nutrient removal facilities that will
remove nitrogen and phosphorus from the wastewater. This project is currently
in the planning stage.
HEALTHCARE
St. Paul’s Hospital
$2.3 BILLION
In February 2019, the Government of British Columbia approved the business
plan for a new St. Paul’s Hospital in the False Creek Flats. The new hospital will
continue to serve as an acute-care hospital and integrated health campus. The
new facility will be expanded to a capacity of 548 beds and be the home of several
leading provincial programs and referral centres, including for heart and lung care,
renal, eating disorders, and specialty surgeries and transplants.
54 RENEW CANADA – TOP100 2024
2023 Rank: 33
Location: Vancouver, B.C.
Owner: Providence Health Care/
Vancouver Coastal Health
DB (F): PCL Construction
Engineer: Tetra Tech (geotechnical
design)
Architect: HDR; Stantec
Other Key Players: Arcadis-IBI
Group (early design works); KPMG
(clinical planning services);
Entuitive; EY (mgmt. consultant);
McElhanney (site surveyor); WSP
(roads, offsite utilities and onsite
design services); Victaulic (supplier)
Legal: Norton Rose Fulbright
(owner), Bennett Jones
Funding: Public/Private
• Provincial: $1.327 billion
• Private: Providence Health Care
$850 million (from sale of existing
hospital site); St. Paul’s Foundation
$136 million
Substantial Completion: 2026
TOP100PROJECTS.CA