The Burnaby Hospital redevelopment project is a
multi-phase project that will transform the hospital into a
modernized medical and surgical health care campus. It
will see two new patient care towers, a new cancer centre
and expansion and renovations to existing buildings
on campus. The first phase, expected to open in 2026,
will include the construction of the new Keith and Betty
Beedie Pavilion and the expansion and renovations to
the existing Support Facilities Building. Phase 2 includes
the construction of the Keith and Betty Beedie Acute Care
Tower, which will feature 160 private rooms to support
general medicine, medical oncology, cardiac telemetry,
intensive care and high-acuity patients, a new medical
imaging department with two CT scanners, a spiritual-care
suite, public spaces and hospital support services.
42
WATER/WASTEWATER
Northwest Langley Wastewater
Treatment Plant
$2.3 BILLION
The Northwest Langley Wastewater Treatment Plant, which currently serves 30,000
people, is being expanded to serve over 280,000 people in the Township of Langley,
Maple Ridge, Pitt Meadows and North Surrey. The plant expansion is one of several
projects taking place to improve the sustainability and resilience of wastewater
treatment in the region. To divert the flows to the Northwest Langley Wastewater
Treatment Plant, a new pump station has been built north of the Fraser River in
Maple Ridge. Two new sewer pipes have been constructed under the Fraser River to
connect the pump station in Maple Ridge to the upgraded treatment plant in Langley.
A new storage tank, located with the pump station, will temporarily store wastewater
to significantly reduce overflows during storms.
43
2025 Rank: 38
Location: Township of Langley, B.C.
Owner: Metro Vancouver
Construction Manager: Delve Underground (Fraser River Crossing), Stantec
(Pump Station and Storage Tank), Jacobs (WWTP Ground Improvements)
Contractors: Pomerleau (Fraser River Crossing and WWTP Ground Improvements), NAC (Pump Station and Storage Tank)
Engineers: Delve Underground (Fraser River Crossing), Stantec (Pump Station and
Storage Tank), Jacobs (Wastewater Treatment Plant); Hatch (owner’s engineer)
Other Key Players: Carollo with sub-consultants WSP, Brown & Caldwell and
Great Pacific (Program Management and technical services), ISL Engineering
(Archaeological Services); Entuitive; Turner & Townsend (management consultant); Marsh Canada (risk advisor)
Legal: Cassels; Norton Rose Fulbright
Funding: Public
Substantial Completion: 2030
BRIDGE
Reconstruction of
Île-aux-Tourtes Bridge
$2.3 BILLION
The Île-aux-Tourtes bridge, which was commissioned
in 1965, is located on autoroute Félix-Leclerc (autoroute
40) and links the island of Montréal (village of Senneville)
and the Montérégie region (city of Vaudreuil-Dorion).
This key structure is part of the strategic road network
supporting trade. To ensure its sustainability, it will be
rebuilt north of the existing bridge. The new bridge will
include: three lanes in each direction; a multipurpose
path; and wide shoulders designed for bus traffic only.
58
2025 Rank: 36
Location: Burnaby, B.C.
Owner: Fraser Health Authority
Procurement Manager: Infrastructure BC
Alliance Development Agreement (Phase 2): PCL
Constructors Westcoast Inc. and Parkin Architects
Western Ltd.
DBF Team: EllisDon Infrastructure (Phase 1)
Other Key Players: WSP (owner’s technical advisor);
Stantec (consulting engineer); Mulvey & Banani;
Victaulic (supplier); Kontur (geotechnical services); Cartel Communications, Inc.; H.H. Angus &
Associates Limited Consulting Engineers (electrical
engineering/ICAT consultant); Arcadis (management
consultant); Colliers Projects Leaders (management
services)
Legal: McMillan LLP
Funding: Public
Substantial Completion: 2030
FRASER HEALTH
Burnaby Hospital
Redevelopment
$2.4 BILLION
RENEW CANADA – TOP100 2026
2025 Rank: 39
Location: Montreal, Que.
Owner: Ministère des Transports et de la Mobilité durable (MTMD)
Contractor: Groupe Nouveau Pont Île-aux-Tourtes (FlatironDragados, Roxboro
Excavation Inc., Construction Demathieu et Bard (CDB); ACS Infra
Engineer: Tetra Tech-Cima+-AECOM (owner’s engineer); Arup / FNX-INNOV (Independent certifier); WSP (consulting engineer-maintenance work on the existing
bridge); GHD, AtkinsRéalis (geotechnical studies); Hatch; Parsons (consulting);
Stantec (structural)
Other Key Players: Strategia conseil (risk and financial advisor); Price-Waterhouse (management consultant); AGAT Labs; INTECH (risk advisor); Ombrages
(lighting consultant)
Legal: Gowling WLG; Lavery
Funding: Public
Substantial Completion: 2030