TOP100 2024 Report - Report - Page 59
44
HEALTHCARE
QEII Health Sciences Centre
Redevelopment
$2 BILLION
The redevelopment of the QEII Health Sciences Centre is a multi-phase project
involving several health care sites throughout Halifax and the surrounding area.
The project will transform health care delivery in Nova Scotia, providing modern
services for patients throughout the province. The primary project elements include:
the renovation of Hants Community Hospital in Windsor; renovation of Dartmouth
General Hospital; a new Community Outpatient Centre in Bayers Lake (opened Nov.
45
2023); expansion of the Halifax Infirmary site; a new hospice residence in Halifax;
and movement of the QEII Cancer Centre to the new Infirmary site. Completion
of these projects will result in the closure of Centennial, Dickson, and Victoria
buildings on the QEII Victoria site in Halifax.
WATER/WASTEWATER
Annacis Island Wastewater
Treatment Plant Expansion
$2 BILLION
There are over 20 projects planned as part of the onsite improvements of the
Annacis Island Wastewater Treatment Plant. Key improvement projects include new
trickling filters, secondary clarifiers, and a co-generation facility to make better use
of green energy captured on site. Detailed design of the remaining Phase 2 works is
underway with construction anticipated to commence in 2025. A new digester and
biosolids dryer have been added to the expansion program.
TOP100PROJECTS.CA
2023 Rank: 37
Location: Halifax, N.S. and surrounding communities
Owner: Government of Nova Scotia
Project Manager: Nova Scotia Lands
Advanced Work Contract (Halifax Infirmary site): Plenary PCL Health
DBFM Contract (Bayers Lake Community Outpatient Centre) – EllisDon
Infrastructure HealthCare
• P3 Electrical Design Team: Mulvey & Banani International Inc./Dillon
Consulting Limited, led by Plan-Group/Cahill.
• P3 Mechanical Design Team: HHA/Dillon Consulting Limited, led by PlanGroup/Cahill.
Contractor: PCL Constructors Canada Ltd. (Hants Community Hospital
renovation)
Other Key Players: Morrison Hershfield (engineer/P3 team member);
Contracting Specialties (2005) Inc.; Coastal Woodworkers Ltd.; Dantra Specialty
Products; Duron Atlantic Limited; Twin City Painting (1979) Limited; Northfield
Glass Group Ltd.; Apex Industries; Atlantica Mechanical; Bond and Coolen
Contracting Ltd.; Life Safety Systems; RKO Steel Ltd.; Southeast Drywall Ltd.;
Inflector Environmental Services; Darim Masonry Limited; Flynn Canada Limited;
McCarthy’s Roofing Limited; Royal Door Limited; Kasian (planing and design
compliance team); Deloitte (financial advisor); Hanscomb (cost consultant);
Entuitive; EXP (geotechnical studies); LEA Consulting (engineer-structural); AGAT
Labs; Arup (consulting engineer); Colliers Project Leaders
Legal: Borden Ladner Gervais; Osler (for the proponent)
Funding: Public/P3
Substantial Completion: TBD
2023 Rank: 54
Location: Delta, B.C.
Owner: Metro Vancouver
Construction Manager: Hatch (outfall project); CDM Smith (Overall Construction
Coordination)
Contractors: JJM Construction and Geopac Inc. (Phase 1 ground improvement
and 12.5 kV power feed relocation); Graham/AECON Joint Venture (Phase 1
treatment plant process structures and equipment); North American Construction
(blowers contract); Kenaidan Contracting (computer control system and
laboratory building, cogeneration and backup power); Maple Reinders Inc.
(Phase 2 Gravity Thickeners and Aeration Tanks Retrofit); Bennett Mechanical
Installations (Phase 2 Digester Heat Exchangers Upgrade); Pomerleau-Bessac
General Partnership (outfall pipeline)
Engineers: Brown and Caldwell, Stantec, EIC Solutions, Klohn Crippen Berger
(stage 5 expansion); CDM Smith, Golder Associates, McMillen Jacobs, Golder-a
WSP company (outfall); Wood/Black & Veatch (cogeneration backup power); EXP
(geotechnical engineering & monitoring/instrumentation); COWI
Other Key Players AECOM (Stage 5 Phase 1 Design review); WSP (materials
engineering & testing); Arup (design architect); Wood E&I (WSP) (consulting
engineer/geotechnical studies & materials tester); Hatch (tunnel design review
and outfall construction management); Colliers Project Leaders; Jacobs; CDM
Smith; Associated Engineering (project and construction management/staff
augmentation); Envirowest (environmental); McElhanney; Victaulic (supplier)
Legal: Norton Rose Fulbright (for Metro Vancouver)
Funding: Public
Substantial Completion: (Phase 2 – Early Works) 2024;
(Outfall) 2026; (Phase 2 ) 2032
RENEW CANADA – TOP100 2024
59