TOP100 2024 Report - Report - Page 76
NEW
Location: Dawson Creek, B.C.
Owner: Northern Health Authority
Design-Builder: Graham Design Builders LP
Project Management Services: Colliers Project
Leaders
Other Key Players: GeoVerra (early works); Entuitive
Supplier: Victaulic
Legal: Bennett Jones
Funding: Public
Provincial: $413 million
Peace River Regional Hospital District:
$177 million
Substantial Completion: 2026
The Dawson Creek and District
Hospital Replacement Project will
result in a new state-of-the-art
facility to address current and
future health and patient care
needs. The project will include the
and construction of a new 24,400
2
m hospital with 70 inpatient
acute beds (providing medical
surgical, maternity, high acuity, and mental health services) two operating rooms, one minor
procedure room, 15 emergency department treatment spaces, academic and teaching
space, LEED Gold certification, and over 300 surface parking stalls plus landscaping.
93
PUBLIC SPACES
BMO Convention and Trade Centre
Expansion Project
$500 MILLION
The 565,000-square-foot expansion will increase
the BMO Centre’s total floor space to over one
million square feet, more than double the centre’s
existing capacity, transforming it into Western
Canada’s largest convention facility with more
than 100,000 square feet of new exhibition space,
38 new meeting rooms, two new ballrooms and a
central gathering space that will feature Canada’s
largest indoor fireplace. The Calgary Stampede and
Calgary Municipal Land Corporation unveiled the
design for the Tier 1 convention venue in 2020, and
the project has made significant progress since, with
the installation of 10,000 metric tonnes of steel that
comprise the building’s impressive structure.
94
2023 Rank: 91
Location: Calgary, Alta.
Owner: Calgary Stampede
Development Manager: Calgary Municipal Land
Corporation
Construction Manager: PCL Construction
Engineer: Tetra Tech (design); Entuitive
Architect: Stantec, S2 Architecture; Populous
(planning and design)
Other Key Players: M3 Development, Wood E&I
(WSP) (materials tester); Colliers Project Leaders
Legal: Bennett Jones
Funding: Public
• Federal: $166.6 million
• Provincial: $166.6 million
• Municipal: $166.6 million
Substantial Completion: 2024
BRT
GO Bus Infrastructure
$500 MILLION
2023 Rank: 92
Location: Greater Toronto-Hamilton Area, Ont.
Owner: Metrolinx
Engineer: Hatch; LEA Consulting; EllisDon (consulting)
Other Key Players: Comtech (project mgmt. consultant); Wood E&I (WSP)
(quality control); Turner & Townsend (cost management)
Funding: Public
Substantial Completion: 2025
Metrolinx continues to invest in GO Bus Infrastructure throughout its GTHA
network, including significant upgrades to several of its stations. The upgrades
are complimentary to the work being done to expand rail service throughout
the same corridor. As of mid-2021, more than 80 per cent of the project
budget had already been spent ($400 million).
76
NORTHERN HEALTH AUTHORITY
Dawson Creek and District Hospital
Replacement Project
$590 MILLION
RENEW CANADA – TOP100 2024
TOP100PROJECTS.CA
METROLINX
92
HEALTHCARE