TOP100 2024 Report - Report - Page 78
NEW
New Portage District
General Hospital
$455 MILLION
The new two-storey Portage Regional Health Centre
will replace an existing 88-bed facility and will include:
114 acute care inpatient beds; increased day surgery
capacity to allow more procedures locally; an expanded
emergency department designed to best practice standards including emergency treatment and assessment
rooms, a trauma room, a stretcher bay, and an ambulance
bay; ambulatory care (new dialysis stations, chemotherapy, child and adult rehabilitation, mental health offices
and interview rooms); enhanced spaces for programs
such as diagnostics, palliative care, and outpatient services including lab and rehabilitation; and a new Indigenous
health services cultural space with a design informed by
Indigenous partners.
Location: Portage la Prairie, Man.
Owner: Southern Health-Santé Sud
Construction Management: PCL Constructors Ltd.
Architects and Interior Design: Ft3 Architecture;
A49
Engineers: Crosier Kilgour (structural); SMS
Engineering Ltd. (mechanical and electrical)
Other Key Players: Nor-Tec Group Ltd. (electrical
contractor); Wescan Construction Services
(mechanical contractor); Preset Piling Ltd. (piling
contractor); Abesco Ltd. (structural steel contractor)
Funding: Public
Substantial Completion: 2025
GOVERNMENT OF MANITOBA
98
HEALTHCARE
NEW
Metro Vancouver is constructing a new water supply
tunnel deep under the Fraser River. The Annacis Water
Supply Tunnel between the City of New Westminster and
the City of Surrey is one of the five new marine crossings
in the region built to withstand a major earthquake.
When complete, it will help ensure the continued delivery
of clean, safe drinking water to the communities south
of the Fraser River well into the future. Construction is
underway and is expected to be completed in 2028. The
project involves building an entry shaft in Surrey and an
exit shaft in New Westminster and using a tunnel boring
machine to excavate the 2.3-kilometre-long tunnel. Once
completed, a 2.6 metre diameter steel water main will
be installed inside the shaft and tunnel, which will be
connected to the regional water distribution system.
Following construction, both shaft sites will be restored
with green space.
100
MILITARY
Canadian Joint Incident Response
Unit Infrastructure Project
$415 MILLION
This project will see the construction of approximately 30,000 square metres of modern
and secure training facilities and spaces to support the Canadian Joint Incident Response
Unit (CJIRU) at 8 Wing Trenton. The project is currently in the design phase with construction
scheduled to begin in summer 2024 and reach substantial completion in 2029.
78
RENEW CANADA – TOP100 2024
Location: New Westminster/Surrey, B.C.
Owner: Metro Vancouver
Construction Manager: Delve Underground
Contractors: Traylor Aecon General Partnership
(General Construction contractor)
Engineers: Hatch (prime), GeoPentech
(geotechnical), Ausenco (environmental)
Other Key Players: Inlailawatash Limited
Partnership (archaeology consultant)
Funding: Public
Substantial Completion: 2028 (commissioning and
restoration)
METRO VANCOUVER
99
WATER/WASTEWATER
Annacis Water Tunnel
$450 MILLION
2023 Rank: 98
Location: Trenton, Ont.
Owner: Department of National Defence
Project Contract Management: Defence Construction Canada
Contrator: Pomerleau
Engineers: Stantec (under contract with Pomerleau as a Modified Design
Build)
Funding: Public
Substantial Completion: 2029