TOP100 2026 Report - Report - Page 56
HEALTHCARE
Projet Hôpital
Vaudreuil-Soulanges
$2.6 BILLION
This ambitious infrastructure project will
provide the region with a 404-bed hospital,
featuring an 11-room operating block and a
41-stretcher emergency department—one of the
biggest in the Montérégie region. This project will
position the Hôpital de Vaudreuil-Soulanges as
a leading-edge facility and a model for the next
generation of Québec hospitals. The hospital will
be equipped with state-of-the-art technologies and
innovations aimed at optimizing the experience
for both patients and staff. It will also be built
according to environmental and sustainable
development best practices.
40
HEALTHCARE
New Hospital for
Sick Children
$2.4 BILLION
Dubbed ‘Project Horizon’ by SickKids, the threephase project to rebuild and rehabilitate The Hospital for
Sick Children in Toronto is well underway. There are three
phases to the project, which are expected to take a total
of 15 years to complete: a new 22-storey Patient Support Centre; the Peter Gilgan Family Patient Care Tower;
and renovations to the existing campus. The new Patient
Support Centre was officially opened in September
2023. The Patient Care Tower is scheduled for completion
in 2029, followed by the completion of the Peter Gilgan
Family Patient Care Tower in 2035.
56
2025 Rank: 33
Location: Vaudreuil-Dorion, Que.
Owner: CISSS (Centre intégré de santé et des services sociaux) de la MontérégieOuest
Engineer: CIMA+; BPA (constultant); EXP (design/environmental/geotechnical
studies)
Architects: Provencher et Roy; Yelle Maillé et associés architectures inc.
Other Key Players: Pomerleau (contractor); Pageau Morel & Associés Inc.
(contractor’s engineer); Stantec Consulting Ltd.; AtkinsRéalis (mechanical
& electrical design); SDK et associés; WSP Canada; Jodoin, Lamarre, Pratte
architects Inc. (contractor’s architects); Lemay Co. Inc.; Menkes, Shooner,
Dagenais, Letourneu Architects; EXP; GHD (geotechnical studies); KPMG; Marsh
Canada (risk advisor)
Funding: Public
Legal: Stikeman Elliott (lender)
Substantial Completion: 2027
CISS – DE LA MONTEREGIE-OUEST
39
CITY OF EDMONTON
The Valley Line West LRT project is the next
phase of Edmonton’s light rail transit expansion.
This project represents a 14-kilometre extension
from downtown Edmonton to Lewis Farms in
west Edmonton. The low-floor, community-integrated, urban-style LRT will help move more people along key corridors as Edmonton grows into
a city of two million over the coming decades.
In 2025 accelerated roadwork continued, with
the three-phased plan started in mid-April and
completed by the end of November.
2025 Rank: 32
Location: Edmonton, Alta.
Owner: City of Edmonton
DB(F) Team: Marigold Infrastructure Partners—Colas, Parsons, Standard General,
Francl Architecture, Fast & Epp, Stantec
Owner’s Engineer: connectEd Transit Partnership: AECOM (owner); Hatch; Mott
MacDonald; DIALOG; ISL Engineering and Land Services; SMA Consulting; reVerb
Communications; Hanscomb; Associated Engineering (consulting)
Other Key Players: EY (financial advisor); Aon, INTECH (risk advisor); Golder
(WSP) (geotechnical studies); Stantec, A.W. Hooker Associates Ltd. (independent
certifier); CIMA+; Northstar Consultancy; INFRATA; Wood (WSP) (geotechnical
studies/materials tester); Englobe; McElhanney (site surveyor); Montrose
Environmental (environmental specialists); AGAT Labs; TWD Technologies Ltd.
Funding: Federal: $948.56 million
Provincial: $1.04 billion
Municipal: $637 million
Substantial Completion: 2028
RENEW CANADA – TOP100 2026
2025 Rank: 35
Location: Toronto, Ont.
Owner: Hospital for Sick Children
Patient Support Care Project Team: Construction Manager: PCL Constructors
Canada Inc., Structural Consultant: Entuitive, Electrical Consultant: Mulvey & Banani,
Mechanical Consultant: The Mitchell Partnership, Demolition: Priestly Demolition,
Peter Gilgan Family Patient Care Tower-Stage 2 Functional
Programmer: RPG
Engineer: WSP (stage 1&2 master planning); R.V. Anderson Associates Ltd.
(consulting)
Architect: Stantec / KPMB Architects (Joint Venture)
Other Key Players: Hanscomb (cost consultant); EY, HKA (management
consultant); H.H. Angus & Associates Limited Consulting Engineers (ICAT
consultant); Colliers Project Leaders
Legal: Borden Ladner Gervais, McMillan LLP (for the owner); Bennett Jones LLP
Funding: Public
Substantial Completion: 2035
TOP100PROJECTS.CA
HOSPITAL FOR SICK CHILDREN
38
LRT
Valley Line West LRT
$2.6 BILLION