HIGHWAY
F.G. Gardiner Expressway
Strategic Rehabilitation Plan
$2.2 BILLION
The F.G. Gardiner Expressway Strategic
Rehabilitation Plan addresses the rehabilitation
of the expressway, extending from Highway 427
to the eastern limit at the Don Valley Parkway
(DVP), including the 11-km at-grade section
from Highway 427 to Dufferin Street with its
32 bridges and structures, and the seven-km
elevated section from Dufferin Street to the DVP
with 335 spans. With two eastbound lanes now
rehabilitated and reopened, crews will begin
the demolition and reconstruction of two centre
lanes, before completing work on the remaining
two westbound lanes.
46
HIGHWAY
Ville-Marie and Viger Tunnels
$2 BILLION
The Ville-Marie and Viger tunnels are
located along route 136, formerly known as
autoroute 720, along a stretch commonly
referred to as autoroute Ville-Marie. The
Ville-Marie tunnel was inaugurated in 1974,
followed by the Viger tunnel in 1986. The
project was divided into six construction lots,
each subject to one or more contracts in order
to optimize the sequence of interventions.
The renovation work began in 2020 and will
continue until 2030.
60
2025 Rank: 42
Location: Toronto, Ont.
Owner: City of Toronto
Section 1 (Cherry St. to Jarvis St.): Aecon (contractor): Stantec, Parsons, GHD (engineers)
Section 2 (Dufferin St. to Strachan Ave.): Grascan
Construction Limited (contractor); Parsons (engineer)
Environmental Services: Dillon Consulting (environmental assessment); Perkins+Will; Hargreaves
Associates
Other Key Players: EY, Hanscomb, and HDR (advisory
support); Aon, Marsh Canada (risk advisor); EllisDon;
Englobe; Entuitive; HKA; EY (financial advisor); ULMA
Construction; TULLOCH
Suppliers: Canam Group; DECAST
Legal: Blake, Cassels & Graydon (City of Toronto);
Osler
Funding: Public
Substantial Completion: 2028
DECAST
45
PROVIDENCE HEALTH CARE
In February 2019, the Government of British Columbia approved the business plan for a new St. Paul’s
Hospital in the False Creek Flats. The new hospital
will continue to serve as an acute-care hospital and
integrated health campus. The new facility will be
expanded to a capacity of 548 beds and be the home
of several leading provincial programs and referral
centres, including for heart and lung care, renal, eating
disorders, and specialty surgeries and transplants.
2025 Rank: 41
Location: Vancouver, B.C.
Owner: Providence Health Care/Vancouver Coastal Health
DB (F) Team: PCL Construction
Engineer: Tetra Tech (geotechnical design)
Architect: HDR; Stantec
Other Key Players: Arcadis (early design works); KPMG (clinical
planning services); Entuitive; EY (mgmt. consultant); McElhanney
(site surveyor); WSP (roads, offsite utilities and onsite design
services); Victaulic (supplier); Cartel Communications Systems Inc.;
Bird Construction (Jacob Bros.-subsidiary); Marsh Canada (risk
advisor)
Legal: Norton Rose Fulbright (owner); Bennett Jones LLP
Funding: Public/Private
Substantial Completion: 2027
RENEW CANADA – TOP100 2026
2025 Rank: 44
Location: Montreal, Que.
Owner: Ministère des Transports et de la Mobilité
durable (MTMD)
Engineer: (Consortium) AECOM/Tetra Tech/Parsons
Other Key Players: WSP (construction services);
TVM 20-30 Consortium—CIMA+/Stantec/FNX-Innov
(construction supervision services); Pomerleau
(contractor-lot 1A); AGAT Labs (environmental
assessment)
Monitoring: TVM 20-30 Consortium (CIMA+/
Stantec Experts-conseils); Accuracy (management
consultant)
Funding: Public
Substantial Completion: 2030
MTMD
44
HEALTHCARE
The New St. Paul’s Hospital
$2.2 BILLION
TOP100PROJECTS.CA