TOP100 2026 Report - Report - Page 62
48
HEALTHCARE
Richmond Hospital
Redevelopment
$1.96 BILLION
The Richmond Hospital Redevelopment Project will be conducted
over four phases between 2022 and
2031. It is currently in Phase One:
Park Centre and Rotunda decant and
demolition. This project includes a
new nine-floor acute care tower—the
Yurkovich Family Pavilion—that will add
113 new beds to the hospital bringing
the total to 353 beds.
49
METRO VANCOUVER
There are over 20 projects planned as part of the onsite improvements of the
Annacis Island Wastewater Treatment Plant. Key improvement projects include new
trickling filters, secondary clarifiers, and a co-generation facility to make better use
of green energy captured on site. Detailed design of the remaining Phase 2 Final
Works is underway with construction anticipated to commence in 2026.
2025 Rank: 46
Location: Delta, B.C.
Owner: Metro Vancouver
Construction Manager: Hatch (outfall project); CDM Smith (Overall
Construction Coordination)
Contractors: Phase 1 Substantially Complete; Maple Reinders Inc. (Phase 2
Gravity Thickeners and Aeration Tanks Retrofit); Bennett Mechanical Installations
(Phase 2 Digester Heat Exchangers Upgrade); Pomerleau-Bessac General
Partnership (outfall pipeline); Graham
Engineers: Brown and Caldwell, Klohn Crippen Berger, CDM Smith, WSP (Stage 5
expansion); CDM Smith, WSP (materials engineering and testing); Golder (WSP)
(outfall); Wood (WSP) (consulting engineer/geotechnical studies & materials
tester); McMillen Jacobs, Arup (design architect); EXP (geotechnical)
Other Key Players: AECOM (Stage 5 Phase 1 Design review); WSP (materials
engineering & testing); Wood E&I (WSP) (consulting engineer/geotechnical
studies & materials tester); Hatch (tunnel design review and outfall construction
management); Colliers Project Leaders; Jacobs; CDM Smith; Associated
Engineering (project and construction management/staff augmentation);
Envirowest (environmental); McElhanney; Victaulic (supplier); Marsh Canada
(risk advisor)
Legal: Norton Rose Fulbright (for Metro Vancouver)
Funding: Public
Substantial Completion: 2032
2025 Rank: 47
Location: Richmond, B.C.
Owner: Vancouver Coastal Health
Phase 2 (Alliance Partners): Graham Design
Builders LP and HDR Architecture Associates, Inc.
Other Key Players: Turner & Townsend (cost
consultant); Entuitive (engineer)
Funding: Public
Provincial: $1.89 billion
Vancouver Coastal Health: $30 million
Richmond Hospital Foundation: $40 million
Substantial Completion: 2031
HEALTHCARE
Red Deer Regional Hospital
Centre Redevelopment
$1.8 BILLION
There are two major components of this redevelopment: (Project 1) construction
of a new patient tower and expansion and renovation of the existing hospital’s main
building; and (Project 2) construction of an ambulatory building. The project will
upgrade several services throughout the hospital site including: an additional patient
tower; six new operating rooms; new Medical Device Reprocessing department; new
cardiac catheterization labs; renovations to various areas within the main building;
newly renovated and expanded emergency department, and; and a new ambulatory
clinic building to be located adjacent to the surface parkade.
62 RENEW CANADA – TOP100 2026
2025 Rank: 48
Location: Red Deer, Alta.
Owner: Alberta Healh Sevices
Developer: Alberta Infrastructure
Construction Manager: Clark Builders
Construction Management (site preparation early construction activities):
Shunda Consulting and Construction Management
Other Key Players: EY (management consultant); INTECH (risk advisor);
KPMG; Canem Systems (Bird Construction subsidiary); Colliers Project Leaders
(furniture and equipment planning services)
Legal: Bennett Jones LLP
Funding: Public
Substantial Completion: 2031
TOP100PROJECTS.CA
VANCOUVER COASTAL HEALTH
47
WATER/WASTEWATER
Annacis Island Wastewater
Treatment Plant Expansion
$2 BILLION