TOP100 2026 Report - Report - Page 65
NEW
53
HEALTHCARE
University Hospital of Northern
British Columbia—Acute Care Tower
$1.68 BILLION
UHNBC
The Early Works phase of the project started in
spring 2024 with the construction of a 471-space
parkade. Following this, the services at the Northern
Interior Health Unit (NIHU) will be relocated to make
way for the construction of the acute care tower on
that site. Upon completion, the 11-story facility will
more than double the number of beds available
for cardiac, mental health and substance use, and
surgical services. The parkade is expected to be
completed by fall 2025, and the NIHU will move by
spring 2026. Construction of the acute care tower will
begin in fall 2026, with plans to open for patients in
winter 2031.
54
SUBWAY
Réno-Systèmes and Réno
Infrastructures Programs
$1.66 BILLION
The Réno-Systèmes program’s objective is to
replace and refurbish the metro’s fixed equipment that
has reached or exceeded its lifecycle. The Réno-Infrastructures program was set up to intervene preventively on all infrastructures. The Metro Accessibility
program is directly devoted to the development of the
level of service and improving the customer experience in terms of universal accessibility by integrating
elevators into stations that already exist and are in
operation, as well as the integration of new pieces of
art in those stations.
STM
Location: Prince George, B.C.
Owner: Northern Health
Alliance Team: EllisDon Corporation (Construction);
DIALOG BC Architecture Engineering and Interior
Design Planning Inc. (Design); and Infrastructure BC
Other Key Players: Colliers Project Leaders
(management services)
Funding: Public
Substantial Completion: 2031
2025 Rank: 52
Location: Montreal, Que.
Owner: Société de transport de Montréal (STM)
Engineer: STM, Consortium: AtkinsRéalis-Stantec;
WSP-Systra JV
Other Key Players: Bairn Architecture et Design;
CIMA+; Englobe (quality management services);
SYSTRA Canada
Funding: Public
Substantial Completion: 2026
NEW
METRO VANCOUVER
55
WATER/WASTEWATER
Coquitlam Water
Main Project
$1.66 BILLION
Metro Vancouver is constructing a new water main
in the City of Coquitlam to optimize the capacity of the
existing Coquitlam water supply system and to meet the
growing demand for drinking water in the region with
the eventual expansion of the source supply under the
Coquitlam Lake Water Supply Project. The Coquitlam
Water Main is approximately 12 kilometres long, and
ranges in diameter from 2.2 to 3.2 metres. The water
main is being constructed in four sections. Construction
of the first pre-build section is underway.
TOP100PROJECTS.CA
2025 Rank: 53
Location: Cities of Coquitlam and Port Coquitlam,
B.C.
Owner: Metro Vancouver
Project/Construction Manager: Stantec
Contractors: Michels; Clearway Construction
Engineers: Jacobs-WSP; Stantec; Hatch
Other Key Players: Marsh Canada (risk advisor)
Legal: Borden Ladner Gervais
Funding: Public
Substantial Completion: 2034
RENEW CANADA – TOP100 2026