The Macdonald Block Complex is the hub for administrative services for the Government of Ontario. The
complex consists of five buildings, including four office towers, with a total of approximately 1.7-million square
feet. Each building in the complex will be taken back to its original building core, remediated, and rebuilt using
modern technologies, systems and materials while preserving the integrity of its many heritage features.
SUBWAY
Bloor-Yonge Station
Capacity Improvements
$1.5 BILLION
The Bloor-Yonge Station project includes
the construction of a new Line 2 passenger
platform and the expansion of both Line 1
passenger platforms, enhancements to the
concourse level, entrances, exits and improved
accessibility features. Advanced construction
includes the removal of the buildings at 81
Bloor Street East and 40 and 42 Hayden Street
to construct a new, accessible subway entrance
as a part of the larger project.
61
2025 Rank: 57
Location: Toronto, Ont.
Owner: Toronto Transit Commission (TTC)
Progressive Design-Build Team: Kenaidan Murphy Joint
Venture (KMJV)
Lead Designer: Arup
Engineer: AECOM (owner’s engineer/preliminary design
and early works)
Other Key Players: Golder (WSP) (geotechnical studies);
WSP; CIMA+; Hanscomb (cost consultant); Marsh Canada
(risk advisor)
Funding: Public
Federal: $500 million
Provincial: $449 million
Municipal: $564 million
Substantial Completion: 2029
TTC
60
2025 Rank: 56
Location: Toronto, Ont.
Owner: Ontario Ministry of Public Business Delivery
Services
Project/Construction Manager: Infrastructure Ontario
DBFM Team: Fengate PCL Progress Partners (FP3)
Developers: Fengate Asset Management and PCL Investments Canada Inc.
Design-Builder: PCL Constructors Canada Inc.
Design Architect: WZMH Architects
Facilities Management: Johnson Controls Canada
Financial Advisor: National Bank Financial
Engineer: TMP (mechanical); LEA Consulting (engineer-consulting & structural)
Other Key Players: Aon, INTECH (risk advisor); Hanscomb;
Stantec; Entuitive; EY (management consultant); Accenture
(project manager); WSP (independent certifier); Turner &
Townsend (cost control/management); Mulvey & Banani;
HKA (management consultant)
Funding: P3
Substantial Completion: 2026
INFRASTRUCTURE ONTARIO
MacDonald Block
Reconstruction Project
$1.54 BILLION
HEALTHCARE
Royal Columbian Hospital
Redevelopment
$1.49 BILLION
The Royal Columbian Hospital redevelopment is a three-phase, multi-year project
that will increase the hospital’s capacity by
approximately 50 per cent. Phase 2, now under
construction, will create the new Jim Pattison
Acute Care Tower with more beds, a larger
Emergency Department and more operating
rooms. Phase 3 will upgrade and expand areas
in existing buildings to support the beds and
services in the new acute care tower.
68 RENEW CANADA – TOP100 2026
2025 Rank: 58
Location: New Westminster, B.C.
Owner: Fraser Health Authority
Design-Build Team: EllisDon Design Build Inc.
Architects: Parkin Architects Ltd.; HDR
Project Manager: Stantec
Other Key Players: WSP (owner’s representative/
technical advisor); EY (management consultant); Victaulic
(supplier); GeoVerra (quality control); ULMA Construction;
Cartel Communications, Inc.; PMP Services Ltd.; H.H.
Angus & Associates Limited Consulting Engineers
(engineer-consulting); TWD Technologies Ltd.; Entuitive
Legal: Bennett Jones LLP
Funding: Public
Substantial Completion: 2028