TOP100 2026 Report - Report - Page 75
BC HYDRO
80
2025 Rank: 77
Location: Campbell River, B.C.
Owner: BC Hydro
Civil Work Contract (Phase 1): Aecon-EBC General
Partnership (AEGP)
Consulting Engineer: Klohn Crippen Berger
Other Key Players: EY (risk advisor); GeoVerra
(site surveyor); Hatch; BAUER Foundations Canada
Inc.; Bird Construction (Fraser River Pile & Dredgesubsidiary); Upland Contracting; A. Wood Bulldozing
Ltd,; McElhanney (site surveyor); Terratech
Drilling; Nucor Harris Rebar; Hatfield Consultants;
Mainstream Biological Consulting; KPMG; AECOM;
TWD Technologies Ltd.; Marsh Canada (risk advisor)
Legal: Borden Ladner Gervais
Funding: Public
Substantial Completion: 2030
Built in the 1940s, the John Hart Dam is about
32 metres tall and more than 800 metres long. The
project work will include upgrades to the earthfill and
concrete sections of the dam; creating an overflow
spillway under the road deck near the spillway; and replacing the three spillway gates and related works.
81
MTMD
HYDROELECTRIC
John Hart Dam
Seismic Upgrade Project
$923 MILLION
HIGHWAY
Autoroute 19 Extension
$899.4 MILLION
The extension of Highway 19 consists of building a two-carriageway urban
highway with three lanes in each direction between Saint-Martin East Boulevard
in Laval and Industriel Boulevard in Bois-des-Filion. Located on the current axis
of Highway 335, the project extends 11.8 kilometres. The work is being carried
out in six separate lots. The project includes: the construction of four new
interchanges; the redevelopment of the interchange of Highway 640 and Route
TOP100PROJECTS.CA
2025 Rank: 79
Location: Laval, Que.
Owner: Ministère des Transports et de la Mobilité
durable (MTMD)
Project Manager: CIMA+-IGF Axiom Joint Venture
Design: WSP-EXP Consortium
General Contractor: Roxboro Excavation Inc.,
Loiselle Inc.
Environmental Services: GHD Consultants Ltd.
(geotechnical study)
Work Monitoring Consortium: CIMA+-StantecAtkinsRéalis
Other Key Players: Englobe (quality control); Aon
(risk advisor); Pomerleau (contractor-Lot 3)
Funding: Public
Federal: $260 million
Provincial: $639.4 million
Substantial Completion: 2027
335, the construction of a new bridge located east of the Athanase-David bridge,
over the Mille Îles River; the renovation of the current Athanase-David bridge; the
installation of noise barriers in various areas located near the urban highway; the
redevelopment and extension of the multi-purpose path for pedestrians, cyclists
and off-road vehicle users; and the reconfiguration of the service roads at the
level of highways 440 and 19.