TOP100 2026 Report - Report - Page 80
Hydro-Québec will refurbish its Carillon generating station, mainly to replace six generating units.
Carillon generating station is a run-of-river power
plant consisting of 14 generating units with a total
installed capacity of 753 MW. Built in the early
1960s, it is a key part of Hydro-Québec’s hydroelectric generating fleet. The station is close to the
greater Montréal area and feeds power into the grid
during peak consumption periods.
PORT
CANXPORT
$750 MILLION
The project will consist of a 108-acre greenfield
development on Ridley Island that will commence
operation in Q3 2026. Ray-Mont Logistics will
develop and operate facilities that provide transloading service capacity for 400,000 TEUs (20-foot
equivalent units) for agricultural, forestry, and plastic
resin products. The project will also include an
expansion of the existing Ridley Island Road Rail
Utility Corridor that will facilitate unit trains 10,000
feet in length.
94
BRT
SRB Pie-IX BRT
$744 MILLION
The Pie-IX BRT is a leading, high-performance public
transit project, integrating the rehabilitation of municipal
infrastructures and the reconstruction of Pie-IX Boulevard.
It is also a public transit infrastructure spread across 13
kilometres, between Saint-Martin Boulevard in Laval and
Notre-Dame East street, including 44 BRT bus shelters
and bus priority lights in real time. In February 2024,
the project launched the next phase of work to extend
the Pie-IX BRT between Pierre-De Coubertin Avenue and
Notre-Dame Street East.
80
2025 Rank: 88
Location: Prince Rupert, B.C.
Owner: Prince Rupert Port Authority
Site Development Contract: Indigenous JV — Metlakatla
First Nation, Lax Kw’alaams Band, Gitxaała Nation and IDL
Projects Inc.
Engineer: Stantec (design)
Substantial Completion: 2026
PRPA
93
2025 Rank: 87
Location: Saint-Andre-d’Argenteuil, Que.
Owner: Hydro-Quebec
Engineer: AECOM; CIMA+ (consulting)
Design: WSP
Other Key Players: HKA (risk advisor)
Turbine Supplier: Andritz
Substantial Completion: 2027
HYDRO-QUEBEC
Carillon Generating Station
Refurbishment Project
$750 MILLION
RENEW CANADA – TOP100 2026
2025 Rank: 89
Location: Montreal and Laval, Que.
Owner: Autorité régionale de transport métropolitain (ARTM)
/ Ministère des Transports et de la Mobilité durable (MTMD)
/ City of Montréal / Société de transport de Montréal (STM)
Delegated Manager: Société de transport de Montréal (STM)
Contractor: Pomerleau; EBC; MGB; G-Tek; Demix; Hudson
Six; Roxboro; De Souza
Engineer: WSP; AECOM; FNX Innov; CIMA+; Stantec; YRH;
Intervia; IGF Axiom
Other Key Players: WSP (pre-feasibility study); CIMA+;
STL; City of Laval; SQI; RTM, EXO; CSEM; HQ; CN; EXP (cost
consultant); HKA (management consultant); Accuracy
(management consultant); Aon (risk advisor); Groupe
ABS (quality control/environmental services); AGAT Labs
(environmental assessment)
Funding: Public
Provincial: $472.5 (ARTM & MTMD)
Municipal: $180.2 million
Substantial Completion: 2027
STM
92
HYDROELECTRIC