17 Eglinton Crosstown West Extension $4.7 billion
2022 Rank: 17
Location: Toronto, Ont.
Owner: Metrolinx
Project/Construction Manager: Infrastructure Ontario
DBF Team (Advance tunnel contract): West End Connectors
• Applicant Lead: Aecon Infrastructure Management Inc.,
Dragados Canada Inc., Ghella Canada Ltd.
• Construction Team: Aecon Infrastructure Management Inc.,
Dragados Canada Inc., Ghella Canada Ltd.
• Design: TYPSA Inc., EXP Services Inc., Dr. G. Sauer & Partners Corporation, Pedelta Canada Inc.
• Financial Advisor: ACS Infrastructure Canada, Aecon Concessions, Scotiabank Capital, Ghella Investments & Partnerships
Engineer: ARUP Canada Inc.; LEA (engineer design); Morrison
Hershfield (consulting)
Other Key Players: Golder-a WSP company (geotechnical
studies); Jacobs (document control, contract administration,
schedule, quality mgmt. and risk assessment); WSP (TTC
Operators Representative); INFRATA (managing consultant)
Supplier: DECAST
Funding: P3
Substantial Completion: 2030-2031
18 Ottawa LRT – Stage 2 $4.675 billion
2022 Rank: 18
Location: Ottawa, Ont.
Owner: City of Ottawa
Engineer: STV Group, AECOM, Parsons and Morrison
Hershfield (owner’s engineer); Kiewit, Vinci, WSP, and Hatch
(Confederation Line design build); SNC Lavalin (Trillium Line
design build maintain); EXP; Golder-a WSP company
Environmental Services: WSP (environmental lead)
Other Key Players: Rideau Transit Maintenance (Confederation Line maintainer); Aon (owner’s advisor and construction
insurance broker); Deloitte (owner’s advisor); A.W. Hooker
Associates Ltd. (Independent Certifier); SENER (Independent
Safety Auditor); INFRATA (managing consultant)
Suppliers: Thales (Confederation Line signaling technology);
Siemens (Trillium Line signaling technology); Alstom (Confederation Line vehicles); Stadler (Trillium Line vehicles)
Legal: Borden Ladner Gervais, Norton Rose Fulbright (owner’s
legal advisor)
Funding: P3
• Federal: $1 billion
• Provincial: $1.208 billion
• Municipal: $2.449 billion
Substantial Completion: 2025
38 ReNew Canada
The Stage 2 Light Rail project will provide the foundation for
the National Capital Region’s growth and evolution through the
twenty-first century. Stage 2, when complete, will extend the
O-Train system farther south, east, and west, adding approximately 44 kilometres of new rail and 24 new stations. With the
completion of Stage 2, 77 per cent of Ottawa residents will live
within five kilometres of fast, efficient, clean, and reliable light
rail service. The system will carry up to 24,000 customers per
hour, per direction during peak periods to, from and through
Ottawa’s downtown core.
Stage 2 is a package of three extensions—south, east,
and west:
• The O-Train South extension will see rail service continue
from Greenboro to Limebank in Riverside South, while adding
a link to the Ottawa Macdonald-Cartier International Airport.
• The O-Train East extension will see LRT continue from Blair
to Place d’Orléans Station, and then all the way to Trim Road
• The O-Train West extension will see LRT continue from Tunney’s Pasture to Moodie and Baseline Stations.
The first portion of the project, the Trillium Line, is planned
for handover to the City of Ottawa in 2023. The second segment, Confederation Line East, is planned for handover at the
end of 2024.
Metrolinx
The Eglinton Crosstown West Extension is an approximately
9.2-kilometre extension of the Eglinton Crosstown LRT (future
Line 5), from Mount Dennis to Renforth Drive. Metrolinx is actively collaborating with the GTAA and municipal partners on
the proposed alignment from Renforth Drive to the airport,
which considers the GTAA’s plans for a Regional Transit Centre.
Tunnelling is one of the first phases of work for the project.
The project is being delivered in four separate contracts:
• Advance Tunnelling DBF contract awarded to West End Connectors in May 2021
• Second Advance Tunnelling DBF contract currently in procurement
• Elevated Guideway DB contract currently in procurement
• Stations and remaining works (procurement dates TBD)