The Hazel McCallion LRT project includes 18 kilometres of new dedicated rapid
transit between Port Credit GO Station in Mississauga to the Gateway Terminal at
Steeles Avenue in Brampton, with 19 surface stops and connections to GO Transit’s
Milton and Lakeshore West rail lines, Mississauga MiWay, Brampton Transit, and
the Mississauga Transitway BRT. In 2024, the Ontario government announced it is
moving forward with an expansion of the project that will include a four-kilometre
extension of the line into downtown Brampton via Main Street from the Brampton
Gateway Terminal and a two-kilometre extension with a loop in Mississauga. The
loop will connect LRT service to Square One with additional stops through to
Confederation Parkway.
15
SUBWAY
Scarborough
Subway Extension
$5.5 BILLION
The Scarborough Subway Extension is a 7.8 kilometre extension of TTC’s Line 2
Bloor-Danforth Subway, from the existing Kennedy Station northeast to McCowan
Road/Sheppard Avenue. The line will include three new stations at Lawrence Avenue
and McCowan Road, Scarborough Centre and a terminal station at McCowan Road
and Sheppard Avenue. The project is being delivered in two large contracts: the
Stations, Rail and Systems package and the Advance Tunnel project.
34
2024 Rank: 13
Location: Mississauga and Brampton, Ont.
Owner: Metrolinx
Project Agent: Infrastructure Ontario
DBFOM Team: Mobilinx Hurontario General Partnership
Applicant Lead: John Laing, Astaldi, Hitachi, Transdev, Amico Concessions, Salini
Impregilo
Construction: Astaldi, Hitachi, Amico, Bot, Salini Impregilo
Design: Arcadis-IBI Group, Hitachi, Stantec, Daoust Lestage, EXP
Operation Maintenance & Rehabilitation Provider: Transdev, Hitachi, Astaldi,
Salini Impregilo
Financial Advisor: National Bank, HSBC
Engineer: Steer Davies Gleave (preliminary engineering); Stantec (design); WSP
(consulting engineering services exclusive to quality assurance oversight for MTO
structures (3) being replaced/rehabilitated as part of the project); SEMP Ltd.
(consulting); Mott MacDonald (consulting)
Other Key Players: DIALOG (urban design); Dufferin Construction; Golder
(WSP) (preliminary geotechnical services); GHD (geotechnical studies)
Hanscomb (preliminary design engineer’s cost consultant); Hatch; LEA Group
(ITS); Aon (owner advisor and construction insurance broker); AECOM (owner’s
representative/technical advisor); EY (financial and transaction advisory);
Stantec (transit O&M advisors); AGAT Labs; Accenture (project manager);
DECAST; RLB; Jacobs (program mgmt.); INTECH (risk advisor); Deloitte (financial
advisor); Englobe; HKA; INFRATA (managing consultant); GFL (soil management);
LEA Consulting (engineer-planning & structural); Parsons (consulting engineer);
Turner & Townsend (cost management); E.S. Fox; TULLOCH
Supplier: DECAST (precast infrastructure)
Legal: Borden Ladner Gervais (legal advisor); Torys (acted for lender); Dentons
Funding: Public
Substantial Completion: 2025
METROLINX
Hazel McCallion LRT
$5.6 BILLION
RENEW CANADA – TOP100 2025
2024 Rank: 14
Location: Scarborough, Ont.
Owner: Metrolinx
DBF Team (Advance Tunnel contract): Strabag Scarborough Project Inc.
• Construction Team: Strabag Inc.
• Design Team: ARUP Canada Inc., Brian Isherwood & Associates Ltd.
• Financial Advisor: Strabag Inc.
Stations, Rails & Systems contract: Scarborough Transit Connect
Applicant Leads: Aecon Infrastructure Management Inc., FCC Construction S.A.
Design Prime Team Member: Mott MacDonald Canada Ltd.
Construction Prime Team Members: Aecon Infrastructure Management Inc., FCC
Construction S.A.
Engineer: OneT+ (Gannett Fleming, Arcadis-IBI Group, GHD)
Design: Hatch (tunnel design); WSP (SSE systems); AECOM (station design)
Environmental Services: Englobe
Other Key Players: Jacobs (quality mgmt. and risk assessment); Accenture
(project/construction manager); WSP (TTC operator’s representative); Stantec
(consulting engineer); Wood (WSP) (consulting engineer/geotechnical
studies); CIMA+; Dillon Consulting (technical advisory services); Entuitive;
EY (management consultant); GFL (excavation, shoring, soil management);
Hanscomb (cost consultant); Parsons (consulting engineer); R.V. Anderson
Associates Ltd.; Turner & Townsend (project controls/estimating); Montrose
Environmental (environmental specialists); AGAT Labs; Aon, INTECH (risk advisor);
Egis; E.S. Fox
Legal: Borden Ladner Gervais (for the owner); Norton Rose Fulbright (for Strabag
Scarborough Project Inc.); Dentons (legal advisor)
Funding: P3
Substantial Completion: 2026
TOP100PROJECTS.CA
METROLINX
14
LRT