TOP100 2025 Report - Report - Page 38
The Eglinton Crosstown West Extension is an approximately
9.2-kilometre extension of the Eglinton Crosstown LRT (future
Line 5), from Mount Dennis to Renforth Drive. Metrolinx is
actively collaborating with the GTAA and municipal partners
on the proposed alignment from Renforth Drive to the airport.
Tunnelling is one of the first phases of work for the project. The
project is being delivered in four separate contracts: Advance
Tunnelling DBF; Second Advance Tunnelling DBF; Elevated
Guideway DB; and Stations and Remaining Work.
18
LRT
Ottawa LRT
– Stage 2
$4.675 BILLION
The Stage 2 Light Rail project, when complete, will extend
the O-Train system farther south, east, and west, adding approximately 44 kilometres of new rail and 24 new stations.
Stage 2 is a package of three extensions—south, east, and
west: The O-Train South extension will see rail service continue
from Greenboro to Limebank in Riverside South, while adding
a link to the Ottawa Macdonald-Cartier International Airport;
the O-Train East extension will see LRT continue from Blair to
Place d’Orléans Station, and then all the way to Trim Road; and
he O-Train West extension will see LRT continue from Tunney’s
Pasture to Moodie and Baseline Stations.
38
2024 Rank: 17
Location: Toronto, Ont.
Owner: Metrolinx
Procurement Agent: Infrastructure Ontario
Advance Tunnelling DBF: West End Connectors
Applicant Lead: Aecon Infrastructure Management Inc., Dragados Canada Inc., Ghella Canada Ltd.
Construction Team: Aecon Infrastructure Management Inc., Dragados Canada Inc., Ghella Canada Ltd.
Design: TYPSA Inc., EXP Services Inc., Dr. G. Sauer & Partners Corporation, Pedelta Canada Inc.
Financial Advisor: ACS Infrastructure Canada, Aecon Concessions, Scotiabank Capital, Ghella
Investments & Partnerships
Second Advance Tunnelling DBF: STRABAG Inc.
Developer: STRABAG Inc.
Design: WSP (Tunnel Design for Short Tunnel); Dr. G. Sauer & Partners Corporation
Construction: STRABAG Inc.
Financial Advisor: STRABAG Inc.
Elevated Guideway DB Team: Aecon Group Inc.
Engineer: ARUP Canada Inc.; LEA (engineer design); Stantec (consulting); Accenture (consulting
engineer/construction manager)
Environmental Services: Montrose Environmental (environmental specialists)
Other Key Players: AECOM; Golder (WSP) (geotechnical studies); Jacobs (document control, contract
administration, schedule, quality mgmt. and risk assessment); WSP (TTC Operators Representative);
INFRATA (managing consultant); A.W. Hooker Associates Ltd. (cost consultant); Dillon Consulting
(technical advisory services); GFL (excavation, shoring, soil management); Hanscomb (cost consultant);
Turner & Townsend (cost management); Hatch (geotechnical and tunnel studies); Parsons (planning
engineer); TULLOCH; Aon, INTECH (risk advisor); E.S. Fox
Supplier: DECAST; Victaulic
Legal: Borden Ladner Gervais (legal advisor-owner); Stikeman Elliott LLP; Dentons; Bennett Jones SLP;
McMillan LLP
Funding: P3
Substantial Completion: 2030-31
METROLINX
Eglinton Crosstown
West Extension
$4.7 BILLION
RENEW CANADA – TOP100 2025
2024 Rank: 18
Location: Ottawa, Ont.
Owner: City of Ottawa
Engineer: STV Group, AECOM (consulting), Parsons and Stantec (Capital Transit Partners/owner’s engineer)
Design-Build Teams: Kiewit, Vinci, WSP, and Hatch (Confederation Line east and west extension
design build); AtkinsRéalis (Trillium Line design build maintain); EXP; Golder (WSP) (owner’s engineer);
EllisDon (environmental)
Environmental Services: WSP (design/geotechnical)
Other Key Players: Rideau Transit Maintenance (Confederation Line maintainer); Aon (owner’s
advisor and construction insurance broker); Deloitte (owner’s advisor); A.W. Hooker Associates
Ltd. (Independent Certifier); PCL Construction (contractor); SENER (Independent Safety Auditor);
INFRATA (managing consultant): ACS Infrastructure; Dragados Canada; Bird Construction; Colliers
Project Leaders (project management support services); Englobe; GFL (excavation, shoring, soil
management); Hanscomb (cost consultant); NORR Architects & Engineers (design/architect); Tiree
(contract management); E.S. Fox; HKA, Accuracy (management consultant); Turner & Townsend (project
management); TULLOCH; GHD (quality control)
Suppliers: Thales (Confederation Line signaling technology); Siemens (Trillium Line signaling
technology); Alstom (Confederation Line vehicles); Stadler (Trillium Line vehicles); DECAST; Cartel
Communications, Inc.; INTECH (risk advisor)
Legal: Borden Ladner Gervais, Norton Rose Fulbright (owner’s legal advisor); Dentons; McMillan LLP:
Torys (consortium); Singleton Urquhart Reynolds Vogel LLP
Funding: P3
• Federal: $1 billion
• Provincial: $1.208 billion
• Municipal: $2.449 billion
Substantial Completion: 2026