TOP100 2025 Report - Report - Page 44
This Finch West LRT project includes 11 kilometres of new semi-dedicated rapid
transit between Humber College and the new Finch West subway, with 18 surface
stops and a below-grade interchange station to connect with the new Finch West
subway station on the TTC’s Line 1. In the Fall of 2024, the project marked a major
milestone with the announcement that of all stations and stops across the Finch West
LRT had been completed.
24
2024 Rank: 23
Location: Toronto, Ont.
Owner: Metrolinx
Procurement Agent: Infrastructure Ontario
DBFM Team: Mosaic Transit Partners–ACS Infrastructure Canada Inc.; Aecon
Concessions; CRH Canada Group Inc.
Construction: Aecon Infrastructure and Management Inc.; Dragados Canada
Inc.; Dufferin Construction Company—a division of CRH Canada Group Inc.
Design: Arup Canada Inc.; Dillon Consulting Limited; DPM Energy Inc.; DTAH;
Perkins + Will Canada Inc.; Sener SES Canada Inc.
Maintenance: ACS Infrastructure Canada Inc.; Aecon O&M—a division of Aecon
Construction Group Inc.
Engineer: Jacobs (owner’s engineer and project manager); WSP (sustainability
consultant/project management/TTC operator’s representative); Hatch (owner’s
engineer); LEA (engineer design); EXP; AECOM, Mott MacDonald (consulting)
Other Key Players: Aon (risk/insurance advisor to authority); EY (advisor); LeighFisher
(lenders technical advisor); Parsons (overseeing technical advisor); INTECH (risk
advisor); Stantec (MEP design services); GHD (traffic mgmt.); GFL (excavation, shoring,
soil management); Accenture (project manager); Rider Levett Bucknall; Englobe; A. W.
Hooker Associates Ltd. (cost consultant); CIMA+; Deloitte (management consultant);
Entuitive; HKA; INFRATA (managing consultant); Turner & Townsend (project controls);
Montrose Environmental (environmental specialists)
Supplier: Bombardier (vehicles); Dufferin Concrete; DECAST (precast
infrastructure); SEMP Ltd. (consulting engineer)
Legal: Norton Rose Fulbright; McMillan LLP (for the lender); Borden Ladner
Gervais (for the owner); Dentons; Singleton Urquhart Reynolds Vogel LLP
Funding: P3
Substantial Completion: 2025
METROLINX
Finch West LRT
$3.43 BILLION
LRT
Hamilton LRT
$3.4 BILLION
The Hamilton LRT project, as proposed, would bring 14 kilometres of rapid transit
to Ontario’s fifth-largest city, connecting McMaster University in the west to Eastgate in
the East, with 17 stops planned on the route. In November, 2024, the Province issued
44 RENEW CANADA – TOP100 2025
2024 Rank: 24
Location: Hamilton, Ont.
Owner: Metrolinx
Procurement Agent: Infrastructure Ontario
Other Key Players: AECOM (consulting engineer); WSP (technical advisory, design
and geotechnical services; Wood (WSP) (consulting engineer/geotechnical
studies); Stantec (engineer-design); Arcadis-IBI Group; Accenture (project
manager); Hatch; Turner & Townsend (project controls/estimating); Dillon
Consulting (design engineer); AGAT Labs (environmental assessment); Egis;
INTECH (risk advisor); KPMG
Legal: Borden Ladner Gervais (for the owner)
Funding: Public
• Federal: $1.7 billion
• Provincial: $1.7 billion
Substantial Completion: TBD
an RFQ for the Civil Works and Utility Relocations contract to lead the construction
of most civil work, including utility relocations, roads, structures, grade separations,
bridges, sidewalks and traffic control signals along the alignment.