Toronto is embarking on the largest and most significant stormwater management
program in the city’s history. This program will greatly improve the water quality
in the Lower Don River, Taylor-Massey Creek and along Toronto’s Inner Harbour by
keeping combined sewer overflows out of our waterways by upgrading technology and
increasing the system’s capacity to capture, transport and treat them. The project is
comprised of an integrated system of tunnels, storage shafts, connections, an integrated pumping station, a high-rate treatment facility, a real-time control system and
wastewater treatment plant upgrades. The program is made up of several individual
26
projects that will work together, including the Don River and Central Waterfront
Wet Weather Flow System, the Ashbridges Bay Treatment Plant (ABTP) Integrated
Pumping Station, ABTP Ultra-Violet (UV) Disinfection Facility, ABTP Landform and
high-rate treatment facility, and the ABTP Outfall.
PUBLIC SPACES
Energy Services Acquisition Program’s
Energy Service Modernization
$3 BILLION
Within the National Capital Region
(NCR), Public Services and Procurement
Canada (PSPC) is responsible for heating
80 buildings and cooling 67 buildings. As
part of PSPC’s activities, the Energy Services
Acquisition Program was established in
2009 to explore new business models for
the provision of energy services in the NCR.
The modernization project is looking for
an energy services solution for PSPC’s five
central heating and cooling plants (CHCP)
and their associated distribution networks
within the NCR. By 2027, the entire District
Energy System will be modernized and
converted from an energy-intensive and
high-polluting steam system to a state-ofthe-art low-temperature hot-water system,
reducing greenhouse gas emissions from
heating and cooling operations by an
estimated 92 per cent.
46
2024 Rank: 25
Location: Toronto, Ont.
Owner: City of Toronto
Don River and Central Waterfront Wet Weather Flow System (DR&CW WWF
System):
• Coxwell bypass (stage 1): Black & Veatch Canada in association with R.V.
Anderson Associates Limited (consultants); North Tunnel Constructors
(contractor)
• Inner Harbour West Tunnel: Hatch/AECOM (consultant)
• Mid-Toronto-Interceptor (MTI) Real-Time Control: Tetra Tech (consultant)
• Integrated Pumping Station (IPS): Black & Veatch Canada in association with R.V.
Anderson Associates Ltd. (consultants); Strabag Canada (contractor-contract 2)
• Ashbridges Bay Landform Project: Toronto and Region Conservation Authority
(TRCA) with Shoreplan Engineering (designer); TRCA (constructor of landform)
• UV (Ultraviolet) Disinfection Facility: AECOM (consultants); Graham (contractor)
• Outfall: Hatch, Jacobs and Baird (consultants); (SAJV) Southland Astaldi Joint
Venture (contractor)
Other Key Players: Wood (WSP) (environmental engineer/geotechnical
studies); Golder (WSP) (geotechnical services); Arcadis-IBI Group (risk
assessment); LEA Consulting (engineer-planning); R.V. Anderson Associates Ltd.;
E.S. Fox; Arup (engineer)
Legal: Stikeman Elliott LLP (advisor)
Funding: Public
Substantial Completion: 2038
CITY OF TORONTO
Don River and Central Waterfront
& Connected Projects
$3 BILLION
RENEW CANADA – TOP100 2025
2024 Rank: 26
Location: Ottawa, Ont.
Owner: Government of Canada
DBFOM Team: Innovate Energy—Black & McDonald
Capital Limited; Black & McDonald Limited; ENGIE
Services Inc.; PCL Constructors Canada Inc.; PCL
Investments Canada Inc.; BBB Architects Ottawa,
Golder (WSP) (design work)
Other Key Players: EY (oversight advisor); WSP
(engineering services); Aon (risk advisor); Tiree/
Colliers Project Leaders (project management &
business consulting services); Turner & Townsend
(cost management)
Legal: Borden Ladner Gervais, Norton Rose Fulbright
(advisor to project owner)
Funding: Public
Substantial Completion: 2027
PSPC
25
WATER/WASTEWATER
TOP100PROJECTS.CA