TOP100 2025 Report - Report - Page 52
Projet Hôpital
Vaudreuil-Soulanges
$2.6 BILLION
This ambitious infrastructure project will provide the region with a 404-bed
hospital, featuring an 11-room operating block and a 41-stretcher emergency department—one of the biggest in the Montérégie region. This project will position the
Hôpital de Vaudreuil-Soulanges as a leading-edge facility and a model for the next
generation of Québec hospitals. The hospital will be equipped with state-of-the-art
technologies and innovations aimed at optimizing the experience for both patients
and staff. It will also be built according to environmental and sustainable development best practices.
HIGHWAY
Louis-HippolyteLafontaine Tunnel Project
$2.5 BILLION
The original Louis-Hippolyte La Fontaine Tunnel
was constructed in 1967 and needed significant
rehabilitation. In July 2020, the contract was
awarded for the rehabilitation project. Construction work began in 2021. The main work in the
tunnel consists of carrying out major structural
repairs, modernizing operating equipment,
redeveloping service corridors, and adding
fire protection. The repair of the pavement of
autoroute 25 northbound began in 2023 and will
continue in 2024. Concreting of walls and arches
are underway in the tunnel’s southbound tube, as
is the work to modernize operation systems.
35
2024 Rank: 33
Location: Montréal, Que.
Owner: Ministère des Transports et de la Mobilité durable
(MTMD)
P3/Project Team: Renouveau La Fontaine (Eurovia Infra,
Pomerleau Inc. and Dodin Campenon Bernard SAS)
Engineer: Parsons, Tetra Tech (owner’s engineer); WSPHatch JV (design); Lombardi (tunnel safety); EXP (design,
consulting)
Other Key Players: Aon, INTECH (risk advisor); CIMA+;
Egis (independent certifier); Jacobs, Accuracy, Deloitte
(management consultant); Englobe; GHD (materials tester)
Financier: Desjardins Capital Markets
Legal: Borden Ladner Gervais; Stikeman Elliott LLP
Funding: P3
• Federal: $427.7 million
• Provincial: $2.064 billion
• Municipal: $4.7 million
Substantial Completion: 2026
HEALTHCARE
New Hospital
for Sick Children
$2.4 BILLION
2024 Rank: 34
Location: Toronto, Ont.
Owner: Hospital for Sick Children
Engineer: WSP (Stage 1&2 master planning); R.V. Anderson Associates Ltd.
(consulting)
Patient Support Care Project Team - Construction Manager: PCL Constructors
Canada Inc.; Structural Consultant: Entuitive; Electrical Consultant: Mulvey &
Banani; Mechanical Consultant: The Mitchell Partnership; Demolition: Priestly
Demolition, Peter Gilgan Family Patient Care Tower-Stage 2 Functional Program
Design Team: Stantec/KPMG joint venture; Functional Programmer: RPG
Other Key Players: Hanscomb (cost consultant); EY, HKA (management
consultant); EY
Supplier: Stantec
Legal: Borden Ladner Gervais, McMillan LLP (for the owner)
Funding: Public
Substantial Completion: 2035
Dubbed ‘Project Horizon’ by
SickKids, the three-phase project to
rebuild and rehabilitate The Hospital
for Sick Children in Toronto is well
underway. There are three phases to
the project, which are expected to
take a total of 15 years to complete:
a new 22-storey Patient Support
Centre; the Peter Gilgan Family
Patient Care Tower; and renovations
to the existing campus. The new
Patient Support Centre, was officially opened in September, 2023.The Patient Care Tower is scheduled for completion in
2029, followed by the completion of the Peter Gilgan Family Patient Care Tower in 2035.
52
MMTD
34
2024 Rank: 32
Location: Vaudreuil-Dorion, Que.
Owner: CISSS (Centre intégré de santé et des services sociaux)
de la Montérégie-Ouest
Engineer: CIMA+; BPA (mechanical/electrical/pluming); EXP (design/
environmental/geotechnical studies)
Architect: Provencher et Roy; Yelle Maillé et associés architectures inc.
Other Key Players: Pomerleau (contractor); Pageau Morel & Associés Inc.
(contractor’s engineer); Stantec Consulting Ltd.; AtkinsRéalis (mechanical
& electrical design); SDK et associés; WSP Canada; Jodoin, Lamarre, Pratte
architects Inc. (contractor’s architects); Lemay Co. Inc.; Menkes, Shooner,
Dagenais, Letourneu Architects; EXP; GHD (geotechnical studies); KPMG
Funding: Public
Substantial Completion: 2026
RENEW CANADA – TOP100 2025
TOP100PROJECTS.CA
HOSPITAL FOR SICK CHILDREN
33