Burnaby Hospital Redevelopment
$2.4 BILLION
The Burnaby Hospital redevelopment project
is a multi-phase project that will transform the
hospital into a modernized medical and surgical
health care campus. It will see two new patient care
towers, a new cancer centre and expansion and
renovations to existing buildings on campus. The
first phase, expected to open in 2026, will include
the construction of the new Keith and Betty Beedie
Pavilion and the expansion and renovations to the
37
existing Support Facilities Building.
Phase 2 includes the construction of the Keith
and Betty Beedie Acute Care Tower, which will
feature 160 private rooms to support general
medicine, medical oncology, cardiac telemetry,
intensive care and high-acuity patients, a
new medical imaging department with two CT
scanners, a spiritual-care suite, public spaces
and hospital support services.
WATER/WASTEWATER
North End Sewage
Treatment Upgrades
$2.34 BILLION
The scope of work for the first capital project includes the design
and construction of a new headworks facility that will include a raw
sewage pump station, a micro-tunnel extension of existing interceptor
sewers, a grit removal system, a main control room, fine screens and
compactors, and a plant emergency generator facility. This project
is currently in construction. The second capital project includes the
design and construction of a new biosolids facilities that will address
end-of-life equipment and regulatory requirements regarding the
recovery of nutrients and maximizing biosolids reuse. It will add new
facilities to treat the sludge from the City’s three sewage treatment
plants and replace end-of-life equipment. The third capital project
includes the design and construction of the nutrient removal facilities
that will remove nitrogen and phosphorus from the wastewater.
38
2024 Rank: 35
Location: Burnaby, B.C.
Owner: Fraser Health Authority
Procurement Manager: Infrastructure BC
Alliance Development Agreement (Phase 2): PCL
Constructors Westcoast Inc. and Parkin Architects
Western Ltd.
DBF Team (Phase 1): EllisDon Infrastructure
Other Key Players: WSP (owner’s technical advisor);
Stantec (consulting engineer); Mulvey & Banani;
Victaulic (supplier); Kontur (geotechnical services);
Cartel Communications, Inc.
Legal: McMillan LLP
Funding: Public
Substantial Completion: 2030
2024 Rank: 36
Location: Winnipeg, Man.
Owner: City of Winnipeg
Engineer: KGS Group (owner’s advocate/consultant)—NEWPCC Power Supply; AECOM
(consulting engineer)—NEWPCC Upgrade: Headworks, Biosolids & Nutrient Removal Facilities,
Design Builder—NEWPCC Power Supply: Black & Macdonald, AECOM (design engineer), Design
Builder—NEWPCC Headwork Facilities: Red River Solutions (Aecon/Oscar Renda JV); Hatch
(design engineer)—NEWPCC Biosolids Facilities Upgrade: Red River Biosolids Partners General
Partnership (Aecon, Oscar Renda Contracting of Canada Inc., MWH Constructors Canada Ltd.
Other Key Players: EY (management consultant); Veolia; P1 Consulting Ltd.; KGS Group Ltd.
(owner’s advocate/consultant); Wood (WSP) (design engineer/geotechnical studies); Stantec
(engineer-design); Colliers Project Leaders; Hanscomb (cost consultant); Deloitte LLP; Buy
Social Canada; Victaulic (supplier)
Legal: Blake, Cassels & Graydon
Funding: Public
• Federal $317 million
• Provincial $264 million
• Municipal $1.755 billion
Substantial Completion: (Headworks) 2027; (Biosolids & Nutrient Removal) 2030
HEALTHCARE
St. Paul’s Hospital
$2.3 BILLION
In February 2019, the Government of
British Columbia approved the business
plan for a new St. Paul’s Hospital in the
False Creek Flats. The new hospital will
continue to serve as an acute-care hospital
and integrated health campus. The new facility will be expanded to a capacity of 548
beds and be the home of several leading
provincial programs and referral centres,
including for heart and lung care, renal,
eating disorders, and specialty surgeries
and transplants.
54 RENEW CANADA – TOP100 2025
2024 Rank: 37
Location: Vancouver, B.C.
Owner: Providence Health Care/Vancouver Coastal Health
DB (F): PCL Construction
Engineer: Tetra Tech (geotechnical design); Mott MacDonald (consulting)
Architect: HDR; Stantec; H.H. Angus & Associates Limited Consulting Engineers
(engineer-consulting)
Other Key Players: Arcadis-IBI Group (early design works); KPMG (clinical
planning services); Entuitive; EY (mgmt. consultant); McElhanney (site
surveyor); WSP (roads, offsite utilities and onsite design services); Victaulic
(supplier); Cartel Communications, Inc.; WhiteWater Concrete; Syber Concrete
Forming ; INTECH (risk advisor)
Legal: Norton Rose Fulbright (owner); Bennett Jones SLP
Funding: Public/Private
• Provincial: $1.327 billion
• Private: Providence Health Care $850 million (from sale of existing hospital
site); St. Paul’s Foundation $136 million
Substantial Completion: 2027