Northwest Langley Wastewater
Treatment Plant
$2.3 BILLION
The Northwest Langley Wastewater Treatment Plant, which currently serves
30,000 people, is being expanded to serve over 280,000 people in the
Township of Langley, Maple Ridge, Pitt Meadows and North Surrey. The plant
expansion is one of several projects taking place to improve the sustainability
and resilience of wastewater treatment in the region. To divert the flows to
the Northwest Langley Wastewater Treatment Plant, a new pump station has
been built north of the Fraser River in Maple Ridge. Two new sewer pipes have
been constructed under the Fraser River to connect the pump station in Maple
Ridge to the upgraded treatment plant in Langley. A new storage tank, located
with the pump station, will temporarily store wastewater to significantly reduce
overflows during storms.
40
HIGHWAY
Reconstruction of the
Île-aux-Tourtes Bridge
$2.3 BILLION
The Île-aux-Tourtes bridge, which
was commissioned in 1965, is located
on autoroute Félix-Leclerc (autoroute
40) and links the island of Montréal
(village of Senneville) and the
Montérégie region (city of VaudreuilDorion). This key structure is part of
the strategic road network supporting
trade. To ensure its sustainability, it will
be rebuilt north of the existing bridge.
The new bridge will include: three lanes
in each direction; a multipurpose path;
and wide shoulders designed for bus
traffic only.
41
2024 Rank: 39
Location: Montréal, Québec
Owner: Ministère des Transports et de la Mobilité durable
Contractor: Groupe Nouveau Pont Île-aux-Tourtes (Dragados Canada
inc., Roxboro Excavation Inc., Construction Demathieu et Bard (CDB); ACS
Infrastructure Canada
Engineer: Tetra Tech-Cima+-AECOM (owner’s engineer); Arup / FNX-INNOV
(Independent certifier); WSP (consulting engineer-maintenance work on the
existing bridge); GHD (geotechnical studies); Hatch; Parsons (consulting)
Other Key Players: Strategia conseil (risk and financial advisor); PriceWaterhouse (management consultant); Marsh (insurance consultant); AGAT Labs;
INTECH (risk advisor)
Legal: Gowling WLG
Funding: Public
Substantial Completion: 2030
HEALTHCARE
Nouveau complexe hospitalier
CHU de Québec-Université Laval
$2.24 BILLION
The New Hospital Complex (NCH) aims to consolidate the activities of L’Hôtel-Dieu de Québec and the Enfant-Jésus Hospital on the same site. The NCH
will become a reference center for several specialties including nephrology,
neurology, oncology, traumatology, and burns. The project places the patient
and employee at its heart to innovate in healthcare and research, and above
all, to provide even better care for the population of eastern Quebec. With a
total of 174,983 square meters of new constructions and the redevelopment
of almost a third of the existing buildings, the NCH will have 700 hospital
beds, including 105 critical care beds, 30 operating rooms and 60 emergency
stretchers.
56
2024 Rank: 38
Location: Township of Langley, B.C.
Owner: Metro Vancouver
Construction Manager: Delve Underground (Fraser River Crossing), Stantec
(Pump Station and Storage Tank), Jacobs (WWTP Ground Improvements)
Contractors: Pomerleau (Fraser River Crossing and WWTP Ground
Improvements), NAC (Pump Station and Storage Tank)
Engineers: Delve Underground (Fraser River Crossing), Stantec (Pump Station and
Storage Tank), Jacobs (Wastewater Treatment Plant); Hatch (owner’s engineer)
Other Key Players: Carollo with sub-consultants WSP, Brown & Caldwell and
Great Pacific (Program Management and technical services), ISL Engineering
(Archaeological Services); Entuitive; McElhanney (site surveyor); Turner &
Townsend (management consultant)
Legal: Cassels; Norton Rose Fulbright
Funding: Public
Substantial Completion: 2024 (Pump Station and Storage Tank), 2024 (Fraser
River Crossing), 2029 (Outfall), 2030 (Wastewater Treatment Plant)
MMTD
39
WATER/WASTEWATER
RENEW CANADA – TOP100 2025
2024 Rank: 40
Location: Quebec City, Que.
Owner: CHU de Québec-Université Laval
Project Manager: Société québécoise des infrastructures (SQI)
Construction Manager: (Phase 1) Pomerleau
Construction Manager: (Phase 2) Groupe Axor Inc.
Commissioning Officer: Ambioner; Pageau Morel et associés inc.
Architect: AES Group-Groupe A/Annexe U; DMG architecture; Lemay ; Jodoin
Lamarre Pratte architectes ; NFOE Inc. ; GLCRM Architectes
Civil engineering and structure: CIMA+; Stantec
Mechanical and Electrical Engineering: Bouthillette Parizeau; Tetra Tech
Other Key Players: Englobe (geotechnical/environmental investigation, quality
control); GHD (vibration monitoring); Golder (WSP) (geotechnical studies);
Deloitte; Arium Design (wayfinding consultant)
Funding: Public/Private
Substantial Completion: 2029