The F.G. Gardiner Expressway Strategic
Rehabilitation Plan addresses the rehabilitation of the expressway, extending from
Highway 427 to the eastern limit at the Don
Valley Parkway (DVP), including the 11-km atgrade section from Highway 427 to Dufferin
Street with its 32 bridges and structures,
and the 7-km elevated section from Dufferin
Street to the DVP with 335 spans. With two
eastbound lanes now rehabilitated and reopened, crews will begin the demolition and
reconstruction of two centre lanes, before
completing work on the remaining two westbound lanes. The full project is expected to
be finished one year ahead of schedule and
includes revitalizing 700 metres of elevated
roadway from Dufferin Street to Strachan
Avenue, reinforcing support structures,
installing new streetlights and upgrading the
traffic management system.
43
HEALTHCARE
Trillium Health Partners Redevelopment
—Peter Gilgan Mississauga Hospital
$2+ BILLION
Trillium Health Partners is the
largest community-based hospital
network in Canada. The new Peter Gilgan
Mississauga Hospital will fully replace
the existing Mississauga Hospital. The
project is being delivered using a new
progressive public-private partnership
(P3) approach, which involves both a
Development Phase Agreement and a
design-build-finance-maintain P3 Project
Agreement. In the Summer of 2024, the
Trillium ED/PCL JV partnership begun
executing the Enabling Works that will
bring substantial changes to the project
site before excavation and construction.
Along with the systematic demolition
of three buildings, there will be major
efforts made to remove and relocate site
utilities, realign site roads, and create
new temporary construction roads to
prepare the site’s footprint for the next
phase of construction.
58
2024 Rank: 41
Location: Toronto, Ont.
Owner: City of Toronto
Section 1: Cherry St. to Jarvis St.
Contractor: Aecon
Consulting Engineers: WSP (design and
construction); Stantec; Parsons; GHD
Section 2: Dufferin St. to Strachan Ave.
Contractor: Grascan Construction Limited
Consulting Engineers: Parsons (OETA)
Environmental Services: Dillon Consulting Limited
(Environmental assessment); Perkins+Will;
Hargreaves Associates
Other Key Players: EY, Hanscomb, and HDR
(advisory support); Aon (risk advisor); EllisDon;
Englobe; Entuitive; HKA; EY (financial advisor); E.S. Fox
Supplier: Canam Group
Legal: Blake, Cassels & Graydon (City of Toronto);
Osler
Funding: Public
Substantial Completion: 2029
CITY OF TORONTO
F.G. Gardiner Expressway
Strategic Rehabilitation Plan
$2.2 BILLION
RENEW CANADA – TOP100 2025
2024 Rank: 42
Location: Mississauga, Ont.
Owner: Trillium Health Partners
Procurement Manager: Infrastructure Ontario
Consultants: Stantec (planning, design, and
conformance services); Colliers Project Leaders
(planning and procurement services); Accenture
(project manager); EY (management consultant);
Hanscomb (cost consultant)
Legal: Borden Ladner Gervais (for the owner)
Development Partner: ED+PCL Healthcare Partners
consortium
Proponent Lead, Developer and Financial Advisor:
EllisDon Capital and PCL Investments
Construction Prime Team Member: EllisDon and
PCL Constructors Canada Inc. Joint Venture
Facilities Management Prime Team Member:
EllisDon Facilities Services
Design Prime Team Members and Architects: Parkin
Architects Ltd., Adamson Associates Architects and
Jodoin Lamarre Pratte Architectes Inc.
Structural Consultant: Stephenson Engineering Inc.
and Read Jones Christoffersen Ltd.
Mechanical Consultant: H.H. Angus & Associates
Limited Consulting Engineers and Smith+Andersen
Electrical and ICAT Systems Consultant: Mulvey &
Banani International Inc. and Smith+Andersen
Other Key Players: INTECH (risk advisor)
Funding: Progressive P3
Substantial Completion: TBD
TOP100PROJECTS.CA
INFRASTRUCTURE ONTARIO
42